Laserfiche WebLink
PROJECT MANAGER <br /> Greg is the Director of Water/Wastewater at WSB with over 28 years of water <br /> *` and wastewater engineering experience in project planning, design, and <br /> construction administration of water treatment facilities as well as with groundwater <br /> and surface water supplies, water storage structures, water distribution systems, <br /> wastewater treatment facilities, and lift stations. Greg is also a water and wastewater <br /> systems design engineer and serves as a Project Manager. Greg has served as the <br /> lead process design engineer and project manager for 11 major water treatment <br /> plants, multiple municipal and park wells, the first fully biological water treatment in <br /> Minnesota, the first advanced oxidation process (AOP) water treatment plant in <br /> Minnesota, and multiple water towers and wells in the Metropolitan Area. <br /> SERVICE GROUP: West Water Treatment Plant I City of Chanhassen, MN <br /> Water/Wastewater C_ T: CITY OF CHANHASSEN <br /> PROJECT DURATION: JUN 2016 - NOV 2018 <br /> REGISTRATION: Greg served as the project manager and lead process design engineer for the design <br /> Professional Engineer and construction of a nine million gallon per day water treatment plant. After WSB <br /> MN#26430 conducted multiple neighborhood meetings and received public input,the plant was <br /> WI#36036 designed with a prairie themed architecture and landscaping to fit into a residential <br /> IA #21765 neighborhood. Based on pilot plant testing and initial evaluations,the plant was <br /> ND#10078 designed with pressure aeration,detention,concrete gravity filters for treating iron, <br /> EDUCATION: manganese,and natural ammonia that exist in the city's west well field. The Minnesota <br /> MS Civil Engineering Section of APWA nominated this project for the National APWA Environment Award. <br /> University of Minnesota, <br /> 2002 Advanced Oxidation Process Water Treatment Plant I St. Anthony, MN <br /> CLIENT: ST. ANTHONY VILLAGE <br /> BS Civil Engineering, PROJECT DURATION: JUN 2015 - MAY 2018 <br /> University of Minnesota, Greg was the Project Manager and the Lead Process Engineer on this project.WSB <br /> 1994 provided professional engineering services to study,design,and provide construction <br /> services for a 3,500 gallon per minute(gpm)advanced oxidation process(AOP)water <br /> treatment plant to treat 1,4-Dioxane.This contaminant was detected in the groundwater <br /> aquifer that provides drinking water for the city's wells.Three UV units were installed <br /> inside a new masonry and precast concrete building constructed adjacent to the city's <br /> existing water treatment plant.The new building or WTP addition includes a chemical <br /> storage room for feeding hydrogen peroxide,an electrical room,and a piping gallery. <br /> The existing effluent piping from the existing greens and filters was routed into the new <br /> WTP addition, metered,and connected to the individual UV treatment units. <br /> A Proposal for Design,Bidding,and Construction Administration for a <br /> Water Treatment Plant for City of Lino Lakes Project Personnel 10 <br />