My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2022-091 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2022
>
2022-091 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2022 7:24:18 PM
Creation date
9/2/2022 9:39:30 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
08/22/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION PROJECT mxmxosn/oeocnvcm <br /> Jon is a Professional Engineer with eight years of experience in water and wuomawuto, <br /> engineering including:water supply systems,sanitary sewer collection systems and water <br /> and wastewater treatment facilities. Prior to joining VVSB. ]on spent two years with a <br /> Al <br /> non-govern menta| organizations in Honduras designing and constructing electricity- <br /> free sustainable drinking water treatment plants. At NS8' he works with growing and <br /> --- <br /> developed communities in the expansion and rehabilitation of their water and sewer <br /> infrastructure. He has experience in project planning, feasibility studies, computer <br /> -~ modeling, design, bidding' construction administration and observation, operator <br /> training, and community engagement. <br /> acnv'Cc an««p' Granular Activated Carbon Water Treatment Plant | St. Paul Park, K4N <br /> Water/Wastewater <br /> CL/cw/. CITY orur. pxuL pxnx <br /> PROJECT DURATION: MAR uo1o ' OCT eouo <br /> nsv/'r»^r/»w' Conducted u feasibility study to evaluate water supply and treatment alternatives. Completed <br /> Professional Engineer <br /> water distribution system modeling to identify water distribution system improvements associated <br /> IVINw57814 <br /> with the water treatment plant (wTp). Provided design, bidding, and construction administration <br /> rooc^`/om. and observation for the granular activated carbon (oAo) w7p Coordinated with state agencies, <br /> msnginEnvironmental |ubomto,ioo, and the community to satisfy stakeholder expectations and provide quality drinking <br /> Processes,Cornell water tn the citvx residents and businesses. <br /> univomuxcol4 <br /> aA Physics and Water Treatment Plant Improvements | TOnk8 88y' MN <br /> wvthemudov'St.Olaf uL/cwn unv OF /omxx axv <br /> CoUoge.2on pnuJsoT ooxxr/um. MAY e018 NOV e020 <br /> Completed u water treatment plant (WTp) evaluation to identify needed improvements. Provided <br /> design, bidding, and construction services for the wTP improvements. Performed construction <br /> administration and observation, assisted with Drinking Water Revolving Fund (ownp) upp|ioution <br /> and construction administration per mwxF contract requirements. <br /> Water Treatment Plant Feasibility Study | Lino Lakes, IVIN <br /> CITY or LINO LAKES <br /> pnojcrro:nxr/om. MAR eoeo Juweoxn <br /> Conducted a feasibility study to evaluate water supply and treatment alternatives.Completed water <br /> distribution ovnam modeling to identify water distribution system improvements associated with <br /> the water treatment plant (WTp). Coordinated with state agencies, laboratories, and the <br /> community »o satisfy stakeholder expectations and provide quality drinking water m the ohv's <br /> residents and businesses. <br /> A Proposal for Design,Bidding,and ConstructionAdministration fo,a <br /> Water Treatment Plant for City of Lino Lakes Project Personnel 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.