EXAMPLE AWARD NOMINATION I WEST WATER TREATMENT PLANT <br /> INNOVATIVE CONSTRUCTION MANAGEMENT <br /> M <br /> ?paw,a <br /> Ili <br /> i <br /> The West Water Treatement Plant project was completed by steep slopes,there were little means for access <br /> under budget and on schedule.The general contractor, and construction staging.Without excavating the <br /> Rice Lake Construction Group,provided construction project area the contractor would not have had enough <br /> management and coordinated 62 subcontractors work space or access for materials storage,requiring <br /> and major material suppliers.Over 220 shop drawing additional materials to be stored off site. <br /> submittals,80 requests for information(RFIs),10 field <br /> orders,and many other clarifications were processed The contractor also streamlined the planning process by <br /> through the duration of the project to ensure the plant using Critical Path Management/Scheduling. Knowing <br /> was constructed properly and up to industry standard. the critical path and adjusting as needed was essential <br /> to proper job planning.The critical path schedule was <br /> The contractor conducted extensive pre-construction the primary tool used to manage everything from the <br /> planning by investing time with project staff to develop submittal/approval stage to procurement,delivery,and <br /> key strategies for construction.For example,they installation. <br /> developed an effective strategy for the mass excavation <br /> of the structures while creating a"working platform" <br /> out of the side of a large hill on site.With the project <br /> being located mostly at the top of the hill,surrounded <br /> 4 <br /> A Proposal for Design,Bidding,and Construction Administration for a <br /> Water Treatment Plant for City of Lino Lakes Appendix 46 <br />