Laserfiche WebLink
OPINION OF PROBABLE COST <br />WSB Project: County Road J (Ramsey CSAH 1 / Anoka CSAH 32) at Hodgson Road (CSAH 49) Intersection Improvements <br />Project Location: Anoka County and Ramsey County, Minnesota <br />WSB Project No.: 019054-000 <br />Date: 09/07/2022 <br />STATEMENT OF ESTIMATED QUANTITIES <br />ITEM NUMBER <br />DESCRIPTION <br />NOTES <br />UNIT <br />UNIT PRICE <br />PROJECT TOTAL <br />ANOKA COUNTY <br />RAMSEY COUNTY <br />CITY OF <br />LINO LAKES <br />50% ANOKA COUNTY <br />50% LINO LAKES <br />50% RAMSEY COUNTY <br />50% SHOREVIEW <br />25% RAMSEY COUNTY <br />75% SHOREVIEW <br />STORM SEWER <br />45% ANOKA COUNTY <br />45% RAMSEY COUNTY <br />5% LINO LAKES <br />5% SHOREVIEW <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />2563.601 <br />TRAFFIC CONTROL <br />LUMPSUM <br />$100,000.00 <br />1 <br />$98,000.00 <br />0.24 <br />$24,000.00 <br />0.32 <br />$32,000.00 <br />0.18 <br />$18,000.00 <br />0.02 <br />$2,000.00 <br />0.02 <br />$2,000.00 <br />0.01 <br />$1,000.00 <br />0.19 <br />$19,000.00 <br />2564.602 <br />INSTALL SIGN <br />EACH <br />$600.00 <br />5 <br />$3,000.00 <br />5 <br />$3,000.00 <br />2564.602 <br />INSTALL SIGN TYPE SPECIAL <br />EACH <br />$290.00 <br />3 <br />$870.00 <br />3 <br />$870.00 <br />2564.602 <br />DELINEATOR / MARKER <br />EACH <br />$140.00 <br />2 <br />$280.00 <br />2 <br />$280.00 <br />2564.602 <br />DELINEATOR / MARKER PANEL <br />EACH <br />$75.00 <br />9 <br />$675.00 <br />1 <br />$75.00 <br />8 <br />$600.00 <br />2564.618 <br />SIGN <br />SQ FT <br />$42.00 <br />777 <br />$32,634.00 <br />177 <br />$7,434.00 <br />600 <br />$25,200.00 <br />2573.501 <br />STABILIZED CONSTRUCTION EXIT <br />LUMPSUM <br />$7,500.00 <br />1 <br />$7,350.00 <br />0.24 <br />$1,800.00 <br />0.32 <br />$2,400.00 <br />0.18 <br />$1,350.00 <br />0.02 <br />$150.00 <br />0.02 <br />$150.00 <br />0.01 <br />$75.00 <br />1 0.19 <br />$1,425.00 <br />2573.501 <br />EROSION CONTROL SUPERVISOR <br />LUMPSUM <br />$8,000.00 <br />1 <br />$7840.00 <br />0.24 <br />$1,920.00 <br />0.32 <br />$2,560.00 <br />0.18 <br />$1,440.00 <br />0.02 <br />$160.00 <br />0.02 <br />$160.00 <br />0.01 <br />$80.00 <br />0.19 <br />$1,520.00 <br />2573.502 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />$163.00 <br />74 <br />$12,062.00 <br />37 <br />$6,031.00 <br />37 <br />$6,031.00 <br />2573.503 <br />SILT FENCE; TYPE MS <br />LIN FT <br />$3.00 <br />3000 <br />$9,000.00 <br />1500 <br />$4,500.00 <br />1500 <br />$4,500.00 <br />2573.503 <br />SEDIMENT CONTROL LOG TYPE COMPOST <br />LIN FT <br />$3.00 <br />8000 <br />$24,000.00 <br />4000 <br />$12,000.00 <br />4000 <br />$12,000.00 <br />2574.508 <br />FERTILIZER TYPE <br />POUND <br />$1.00 <br />1200 <br />$1,200.00 <br />600 <br />$600.00 <br />600 <br />$600.00 <br />2575.505 <br />SEEDING <br />ACRE <br />$190.00 <br />3.5 <br />$665.00 <br />2.0 <br />$380.00 <br />1.5 <br />$285.00 <br />2575.508 <br />SEED MIXTURE 25-131 <br />POUND <br />$4.00 <br />860 <br />$3,440.00 <br />430 <br />$1,720.00 <br />430 <br />$1 720.00 <br />2575.523 <br />RAPID STABILIZATION METHOD 3 <br />M GALLON <br />$370.00 <br />40 <br />$14,800.00 <br />20 <br />$7,400.00 <br />20 <br />$7,400.00 <br />2582.503 <br />4" SOLID LINE MULTI COMP <br />11 <br />LIN FT <br />$1.00 <br />9941 <br />$9,941.00 <br />6735 <br />$6,735.00 <br />3206 <br />$3 206.00 <br />2582.503 <br />24" SOLID LINE MULTI COMP <br />11 <br />LIN FT <br />$16.00 <br />552 <br />$8,832.00 <br />291 <br />$4,656.00 <br />261 <br />$4,176.00 <br />2582.503 <br />4" BROKEN LINE MULTI COMP <br />11 <br />LIN FT <br />$2.00 <br />320 <br />$640.00 <br />210 <br />$420.00 <br />110 <br />$220.00 <br />2582.503 <br />4" DBLE SOLID LINE MULTI COMP <br />11 <br />LIN FT <br />$2.00 <br />3926 <br />$7,852.00 <br />2453 <br />$4,906.00 <br />1473 <br />$2,946.00 <br />2582.503 <br />4" SOLID LINE PREF TAPE <br />11 <br />LIN FT <br />$6.00 <br />748 <br />$4 488.00 <br />333 <br />$1 998.00 <br />415 <br />$2,490.00 <br />2582.503 <br />12" DOTTED LINE PREF TAPE <br />11 <br />LIN FT <br />$14.00 <br />30 <br />$420.00 <br />15 <br />$210.00 <br />15 <br />$210.00 <br />2582.518 <br />PAVT MSSG PREF THERMO <br />SO FT <br />$50.00 <br />220 <br />$11 000.00 <br />62 <br />$3 100.00 <br />158 <br />$7 900.00 <br />2582.518 <br />CROSSWALK PREF THERMO <br />SQFT <br />$25.00 <br />1272 <br />$31,800.00 <br />600 <br />$15,000.00 <br />672 <br />$16,800.00 <br />ROADWAY CONSTRUCTION TOTAL <br />$3 979 797.00 <br />$ 1,022,050.00 <br />$ 1,279,948.00 <br />$ 730 886.00 <br />$ 75 620.00 <br />$ 66 659.00 <br />$ 44 569.00 <br />$ 760 065.00 <br />LINO LAKES <br />Cost share items: <br />$75,813.25 <br />Total construction cost: <br />$806,699.25 <br />8% const. eng.: <br />$64,535.94 <br />TOTAL COST: <br />$871,235.19 <br />Page 2 P:\002-649-003 CSAH 49 at CR J\Documents\Agreements\Lino Lakes JPA\Copy of 019054-000_EngineerEstimate_2022-09-06.xlsx <br />