My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-05-2022 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
2022 Park Board Packets
>
10-05-2022 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 3:23:06 PM
Creation date
9/29/2022 2:55:46 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
10/05/2022
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />DATE: October 5, 2022 <br /> <br />TO: Park Board Members <br /> <br />FROM: Rick DeGardner, Public Services Director <br /> <br />RE: Woods of Baldwin Lake Park Update <br /> <br /> <br />A tremendous amount of work has been completed over the past few weeks: <br /> <br />• Contractor cleared out underbrush, buckthorn, and several dead trees. Ash and <br />cottonwood trees were also removed. <br />• Park area was graded and native grasses were planted along the south side of the park that <br />will be 2-3’ in height. <br />• Concrete curbing for the playground area has been installed. The playground equipment is <br />scheduled to be installed the week of October 3 by Parks Department employees and a <br />certified playground installer. <br />• The footings for the open-air shelter are scheduled to be installed the week of October 3, <br />with the shelter being installed by the end of October. <br />• The base of the ½ court basketball court has been installed. Anticipate paving and painting <br />the court in the Spring. <br />• Adjacent homeowners expressed that they were not in favor of a split rail fence getting <br />installed along the southern park boundary. Rather, we will be designing a landscape plan <br />that will provide additional buffering. We plan on ordering the plant material this Winter <br />with parks department staff planting in the Spring, 2023. <br />• The existing paved trail has been removed, and new base has been installed. We are <br />expecting that the trails will be paved yet this Fall, but we need to wait until the <br />playground equipment and park shelter are installed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.