My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-22 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2022
>
08-22 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 4:59:50 PM
Creation date
11/30/2022 12:52:51 PM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
11/28/2022
Ordinance #
08-22
Ordinance Title
Amending City Code, Chapter 1007, Zoning Code
Ordinance Date Passed
11/28/02022
Ordinance Date Published
12/06/2022
Publication Newspaper
Quad Press
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k. The plan shall be coordinated with utility planning so that utilities are <br />installed in a manner that protects trees intended to be saved. <br />5. Trees to be preserved shall be tagged in the field and keyed to the tree <br />preservation plan. The City may inspect the trees to verify compliance with the preservation <br />plan at any time during construction. <br />6. If a natural resource management plan has been approved for the site, the tree <br />preservation plan shall be in compliance with said plan. <br />the City. <br />7. The following shall occur prior to soil disturbance: <br />a. The tree preservation plan shall be approved by the City. <br />b. Fencing and all tree protection measures shall be installed and inspected by <br />c. Erosion control measures shall be installed and inspected by the City. <br />d. All required financial securities have been submitted. <br />e. Any required development agreement has been approved. <br />(n) Tree Preservation during Construction: Trees that are to be preserved must be <br />protected by the following methods unless otherwise approved by the City. <br />1. Before land clearing, grading, or construction begins, the City approved tree <br />protection fencing or other method shall be installed and maintained around the Root Protection <br />Zone of the trees to be protected. Fencing shall be a minimum of four (4) feet high and of a <br />highly visible material, such as snow fence or polyethylene laminar safety netting, and must be <br />standing throughout the construction process. Cut roots with clean, pruning cuts at the fence line <br />prior to fence installation to avoid later tearing of the roots. Signage shall be installed to instruct <br />workers to stay out of the Root Protection Zone. <br />2. Areas where development must encroach upon the root protection zone must be <br />identified on the tree preservation plan in which case the fencing shall be installed at that edge. <br />3. No actions that may harm the health of the tree; including but not limited to <br />construction, traffic, compaction, storage of equipment or materials including soil, grading, or <br />concrete washout areas; may occur in the Root Protection Zone. <br />4. Trees damaged by construction, or with more than 30 percent of the roots <br />disturbed, shall be counted as removed and mitigated at applicable rates. <br />5. Tree protection measures shall remain in place until all grading and construction <br />activity is terminated. <br />116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.