My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-12-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
12-12-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 2:08:02 PM
Creation date
12/12/2022 1:59:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/12/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />AGENDA ITEM 6C <br />STAFF ORIGINATOR: Diane Hankee, PE City Engineer <br />Kelsey Gelhar, PE Project Manager <br />C. C. MEETING DATE: December 12, 2022 <br />TOPIC: Consider Resolution No. 22-149, Order Project, Approve the <br />Plans and Specifications and Authorize the Ad for Bid, 2023 <br />Street Rehabilitation Project <br />VOTE REQUIRED: 3/5 <br />INTRODUCTION <br />Staff is requesting Council approval to authorize the ad for bid for the 2023 Street Rehabilitation <br />Project. <br />BACKGROUND <br />On October 24, 2022, the City Council approved the preparation of the plans and specifications for <br />the 2023 Street Rehabilitation Project. The scope of the 2023 Street Rehabilitation Project is <br />from the City's Pavement Management Program and Capital Improvement Planning. The <br />Pavement Management Program evaluates the condition of the roadways and provides <br />recommendations for maintenance for the City's entire network of roadways. The proposed <br />improvements are as follows: <br />Full Depth Reclamation (approximately 0.25 miles) — Black Duck Drive (from 200 ft north <br />of Crystal Court to the cul-de-sac). <br />Mill and Overlay(approximately 1.29 miles) — Black Duck Drive (from 100 ft south of East <br />Shadow Lake Drive to 200 ft north of Crystal Court), Crystal Court, Mallard Lane, East <br />Shadow Lake Drive (from Black Duck Drive to the cul-de-sac (excluding the recently <br />reconstructed intersection of East Shadow Lake Drive at Lantern Lane), Lantern Lane, <br />Lantern Circle, and Partridge Place. <br />Within the mill and overlay and full depth reclamation areas, gate valves will be replaced if they <br />have not been previously repaired. Black Duck Drive south of the East Shadow Lake Drive <br />intersection is planned to be overlaid in 2024. Part of Black Duck Drive and Black Duck Circle <br />have 6-inch diameter water main, which likely has saddled services. Saddled services of this age <br />and material have historically been corroded. Thus, we plan to include a few service repair <br />investigations along Black Duck Drive and Lantern Lane in the 2023 project scope to prepare for <br />the 2024 project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.