Laserfiche WebLink
sets, full size (22 inches by 34 inches); and one electronic copy in a .pdf ^no plan cot <br />0 n aGGOrdanGe with aplplicable zoning and subdivision provisions of Gity code. format. <br />All plan sets shall also be submitted electronically in a .dwg format or as otherwise <br />determined by the City Engineer. The minima rn information req uiromontc of the <br />NPDF=S permit requirements and in ado the following information• <br />(a) A grading, erosion and sediment control plan and, for projects that require a <br />NPDES permit, a stormwater pollution prevention plan (SWPPP) is row; <br />(b) Stormwater management plan including existing and proposed hydrologic <br />calculations for total runoff volume and peak discharge rates as described in this <br />chapter, including: <br />1. A narrative including a project description, discussion of BMP selection, <br />incorporation of infiltration BMPs, and revegetation plan for the project site; <br />2. Delineation of all drainage areas, including contributing runoff from off -site <br />areas, proposed and existing subwatersheds on -site, emergency overflows, and <br />drainage ways; <br />3. Existing, proposed, and total amount of impervious surfaces created by <br />the project; <br />4. Existing and proposed runoff curve numbers; <br />5. Time of concentration used in calculations; and <br />6. Existing and proposed total runoff volume and peak discharge rates for <br />the two-, ten-, and 100-year critical events utilizing NOAA Atlas 14. <br />(c) Property of lines and delineation of lands under ownership of the applicant. <br />(d) Locations of all stormwater management practices, infiltration areas, and <br />areas not to be disturbed during construction. <br />(e) Location of all drain tiles on the project site shall be identified. <br />(f) Location and engineered designs for structural stormwater management <br />practices including stormwater treatment devices that remove oil and floatable material <br />(e.g., basin outlets with submerged inlets). <br />(g) Normal water level, high water level, and emergency overflow elevations for <br />the site and all ponding systems related to NAVD88. <br />(h) Identification of existing and proposed one -foot contour elevations within the <br />project site related to NAVD88. <br />(i) Geotechnical analysis including soil borings at all proposed stormwater <br />management facility locations ASTM D5921 and D2488. <br />Q) Provisions for groundwater management (dewatering), including subsurface <br />drains, disposals, ponding and flood controls. <br />