My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-12-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
12-12-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 2:08:02 PM
Creation date
12/12/2022 1:59:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/12/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Inspection. All private stormwater facilities must submit an as -built record <br />plan of the facility and must provide documentation to the city of an inspection during <br />construction, during the first year of operation, and at least once every five years <br />thereafter. Private facilities are subject to city inspection at any time to ensure <br />compliance. <br />(b) Public stormwater facilities. <br />1. Acceptance of publicly owned facilities. Before work under the permit is <br />deemed complete, as-builts and certification must be submitted demonstrating at the <br />time of final stabilization that the stormwater facilities conform to design specifications. <br />A final inspection shall be required before the city accepts ownership of the stormwater <br />facilities. <br />2. Inventory of stormwater facilities. The city shall inventory and maintain a <br />database for all public stormwater facilities within the city requiring maintenance to <br />ensure compliance with this chapter. <br />(3) Maintenance. The city shall perform maintenance of publicly owned stormwater <br />facilities within the city as provided for in the local surface water management plan. <br />(Ord. 09-15, passed 10-26-2015) <br />§ 1011.013 PLAN REVIEW PROCEDURE. <br />Plan review. The applicant shall not commence any construction activity subject to <br />this chapter until the stormwater management plan and/or the grading, erosion and <br />sediment control plan have been approved by the city. The submittal shall be processed <br />in accordance with: <br />-Ch. 1007.020 of city code as applicable. § 2 of the Zening QrdinanGe or Ch. 1011 „f <br />Eity Gede as appliEab City approval is contingent on issuance of all other permits <br />required by the city or other agencies having jurisdiction on the project. The following <br />standards shall apply to all developments within the city: <br />(1) Plan approval. If the city determines that the stormwater management plan <br />and/or the grading, erosion and sediment control plan meets the requirements of this <br />chapter, the city shall issue a plan approval valid for a specified period of time that <br />authorizes the land disturbance activity contingent on the implementation and <br />completion of this plan. <br />(2) Plan denial. If the city determines that the plan does not meet the requirements <br />of this chapter, the city shall not issue plan approval for the land disturbance activity. <br />This plan must be resubmitted for approval before the land disturbance activity begins. <br />All land use and building permits shall be suspended until the developer has an <br />approved €CSC or stormwater maRagemeRtpermit for ESC or stormwater management. <br />(3) Modification of plan. The applicant must amend the plan as necessary to include <br />additional requirements such as additional or modified BMPs designed to correct <br />problems identified or address situations whenever: <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.