My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-03-2022 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
10-03-2022 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 9:10:12 AM
Creation date
12/12/2022 2:13:03 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/03/2022
Council Meeting Type
Work Session Special
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL ASSESSMENT WORKSHEET // Robinson Sod Farm <br /> <br />PAGE 4 <br />Mass grading is anticipated to begin winter 2023 with the first phase of utilities and streets <br />completed by July 2023. Home construction is anticipated to begin July 2023 with a full build out of <br />the community taking place over four to five years depending on market conditions. <br />c. Project magnitude: <br />Table 2a. Project Magnitude Data – PUD Concept Plan (557 Units) <br />Total Project Acreage 158 acres <br />Linear project length 16,000 linear feet public roadway <br />6,800 linear feet private roadway <br />Number and type of residential units: <br />PUD Concept Plan <br />45 75-feet wide Single Family Lots <br />117 65-feet wide Single Family Lots <br />80 55-feet wide Single Family Lots <br />191 Row Townhomes <br />124 Back-to-back & Row Townhomes <br />557 total residential units <br />Commercial building area (in square feet) N/A <br />Industrial building area (in square feet) N/A <br />Institutional building area (in square feet) N/A <br />Other uses – specify (in square feet) Stormwater ponds: 840,708 <br />Lake: 270,072 <br />Structure height(s) Back-to-back townhomes will be three stories tall <br />(2 stories above a garage). Row townhomes will <br />be two or three stories tall. Structured multi <br />family housing will be two stories tall. Single <br />Family Homes will be one or two stories tall. <br />Table 3b. Project Magnitude Data – Yield Plan (707 Units) <br />Total Project Acreage 158 acres <br />Linear project length 13,600 linear feet public roadway <br />14,700 linear feet private roadway <br />Number and type of residential units: <br />Yield Plan <br />148 80-feet wide Single Family Lots <br />386 Row Townhomes <br />172 Back-to-back & Row Townhomes <br />1 Existing Home on New Lot <br />707 total residential units <br />Commercial building area (in square feet) N/A <br />Industrial building area (in square feet) N/A <br />Institutional building area (in square feet) N/A <br />Other uses – specify (in square feet) Stormwater ponds: 932,184 <br />Structure height(s) Back-to-back townhomes will be three stories tall <br />(2 stories above a garage). Row townhomes will <br />be two or three stories tall. Structured multi <br />family housing will be two stories tall. Single <br />Family Homes will be one or two stories tall. <br /> <br />3 story structures are going to make our one or one <br />and a half story homes look bad. <br />1 <br />2 <br />3 <br />45 <br />6 <br />7 <br />8 <br />910 <br />11 <br />12
The URL can be used to link to this page
Your browser does not support the video tag.