My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-03-2022 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
10-03-2022 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 9:10:12 AM
Creation date
12/12/2022 2:13:03 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/03/2022
Council Meeting Type
Work Session Special
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL ASSESSMENT WORKSHEET // Robinson Sod Farm <br /> <br />PAGE 28 <br />• Results of the year 2025 and year 2040 no build traffic operations analysis indicate that <br />all study intersections are expected to operate at overall LOS A during the weekday a.m. <br />and p.m. peak hours. In addition, no side-street delay or queuing issues were observed in <br />traffic simulations. <br />• Results of the year 2025 and year 2040 build traffic operations analysis indicate that all <br />study intersections are expected to operate at overall LOS B or better during the <br />weekday a.m. and p.m. peak hours. In addition, no side-street delay or queuing issues <br />were observed in traffic simulations. <br />• The proposed development is expected to have limited impact on study area traffic <br />operations or the regional transportation system. Therefore, no geometric or traffic <br />control improvements are required from an operations perspective. <br /> <br />c. Identify measures that will be taken to minimize or mitigate project related transportation effects. <br />While roadway improvements are not required from a traffic operations or regional <br />transportation system perspective, the following recommendations should be considered: <br />• Dedicated eastbound right-turn and westbound left-turn lanes are proposed at the Main <br />Street/North Access (Century Trail) intersection. A dedicated northbound right-turn lane <br />is proposed at the Sunset Avenue/West Access intersection. A dedicated southbound <br />left-turn lane is proposed at the Sunset Avenue/Robinson Drive intersection. While these <br />turn lanes are not required from an operations perspective, they would be expected to <br />provide a safety benefit in minimizing the potential for rear-end crashes. <br />• Caution should be exercised when placing development signing and/or landscaping near <br />proposed site accesses so as to not create a new sight obstruction. <br />• Turning movements should be reviewed to ensure design vehicles such as school buses <br />and garbage trucks have adequate accommodations to negotiate internal proposed <br />development roadways. <br />• Establish appropriate traffic control at proposed development internal roadway <br />intersections consistent with local jurisdiction policies to minimize driver confusion and <br />the potential for conflicts. <br /> <br />See Appendix F for the Traffic Study. <br /> <br /> <br /> <br /> <br /> <br /> <br />There will be a huge impact to Carl Street residents if Carl Street is made accessible. It is currently a dead-end road. <br />What measures will be taken for Carl Street? <br />1 <br />2 <br />3
The URL can be used to link to this page
Your browser does not support the video tag.