My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-10-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
10-10-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:32:43 PM
Creation date
12/12/2022 2:13:48 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/10/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aALLIANT ENVIRONMENTAL ASSESSMENT WORKSHEET 11 Robinson Sod Farm <br />Mass grading is anticipated to begin winter 2023 with the first phase of utilities and streets <br />completed by July 2023. Home construction is anticipated to begin July 2023 with a full build out of <br />the community taking place over four to five years depending on market conditions. <br />c. Project magnitude: <br />Table 2a. Project Magnitude Data — PUD Concept Plan (557 Units) <br />Linear project length <br />Number and type of residential units: <br />PUD Concept Plan <br />Commercial building area (in square feet) <br />Industrial building area (in square feet) <br />Institutional building area (in square feet) <br />16,000 linear feet public roadway <br />6,800 linear feet private roadway <br />45 75-feet wide Single Family Lots <br />117 65-feet wide Single Family Lots <br />80 55-feet wide Single Family Lots <br />091 Row Townhomes <br />1124 Back-to-back & Row Townhomes <br />557 total residential units <br />N/A <br />N/A <br />N/A <br />Other uses —specify (in square feet) Stormwater ponds: 840,708 <br />Lake: 270,072 <br />Structure height(s) Back-to-back townhomes will be three stories tall <br />3 story structures are going to make our one or one(2Btories above a garage Row townhomes will <br />and a half story homes look bad. be two or three stories tall. Qtructured multi <br />family housing will be two stories tall. Single <br />Family Homes will be one or two stories tall. <br />Table 3b. Project Magnitude Data —Yield Plan (707 Units) <br />Linear project length <br />Number and type of residential units: <br />Yield Plan <br />Commercial building area (in square feet) <br />Industrial building area (in square feet) <br />Institutional building area (in square feet) <br />Other uses — specify (in square feet) <br />Structure height(s) <br />13,600 linear feet public roadway <br />14,700 linear feet private roadway <br />148 80-feet wide Single Family Lots <br />1186 Row Townhomes <br />172 Back-to-back & Row Townhomes <br />1 Existinia Home on New Lot <br />707 total residential units <br />N/A <br />N/A <br />N/A <br />Stormwater ponds: 932,184 <br />Rack -to -back townhomes will be three stories tall <br />(2 stories above a garage). Row townhomes will <br />Eo be two or three stories tall. Qtructured multi <br />family housing will be two stories tall. "gle <br />12 1 v Homes will be one or two stories tall. <br />PAGE 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.