Laserfiche WebLink
Project Description, cont. <br />3. Explain how the project will be sustained over time after the grant funds are depleted. <br />After the one-time cost of $29,198 for the enclosure construction, <br />there should be minimal maintenance costs due to the composite <br />board design. The city will be able to maintain these sites by <br />replacing boards and hardware as needed to ensure the site remains <br />functional overtime. <br />Project Outcomes <br />1. Describe expected project outcomes including materials to be collected for reuse or recycling and <br />estimated annual diversion weight for each material. <br />At this point, our sites typically collect about 1150 pounds per month, but they also fill up. With the <br />increased capacity afforded by the dumpster/enclosure site, we will be sure that no one has to turn <br />around without dumping their organics. <br />Estimated annual organics diversion from one site: 6.9 tons. <br />With the increased capacity, 10+ tons per year for one site should be attainable. <br />2022 Municipal Waste Prevention and Recycling Grant Program 3 <br />