My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-10-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
10-10-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:32:43 PM
Creation date
12/12/2022 2:13:48 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/10/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Avenue Improvements from Main Street to Pine Street. the Karth Area Improvements <br />including Karth Road, Joyer Lane, Talle Ln, Canfield Road, and Gaage Lane Drive <br />Improvements; the Pheasant Run Improvements from Birch Street to its northern <br />terminus: and the costs of issuing the bonds. Such bonds may be combined with other <br />financing tools, including general obligation improvement bonds, to finance other <br />capital improvements in the City. <br />The bonding forthe 4t" Avenue Improvements the Karth Area Improvements, and the <br />Pheasant Run Improvements is expected to occur in 2021 but could happen at any <br />time during the 2020 through 2024 Five -Year Street Reconstruction Plan. <br />4t" Avenue Improvements <br />The pavement on 4t" Avenue is in very poor condition. The roadway is located in a <br />high water table and poorly draining soils are located under and adjacent to the <br />roadway. Portion of the road cross through wetlands with surface water one foot <br />below the roadway. Large potholes have occurred in many areas of the roadway. In <br />order to reconstruct the road, the roadway will need drainage issues corrected . The <br />road reconstruction project will include reconstructing the street to meet the City's <br />standard road requirements, improvement of the drainage system to keep <br />stormwater from compromising the new roadway, and meeting the Rice Creek <br />Watershed District's rate control and water quality treatment requirements related <br />to the construction of the new roadway. The road reconstruction project will also <br />include investigating the conditions of the County Ditch culvert under the roadway <br />and reconstructing the culvert if necessary. <br />Karth Area Improvements <br />The pavement of streets within the Karth Area are also in very poor condition. The <br />road reconstruction project will include reconstructing the street to meet the City's <br />standard road requirements, improvement of the drainage system to keep <br />stormwater from compromising the new roadway and meeting the Rice Creek <br />Watershed District's rate control and water quality treatment requirements related <br />to the construction of the new roadway. <br />Pheasant Run Improvements <br />The pavement on Pheasant Run and the drainage system including existing curb and <br />gutter is in poor condition. The road construction project will include reconstructing <br />the roadway to meet the City's standard road requirements, improvement of the <br />drainage system to keep stormwater from compromising the new roadway and <br />meeting the Rice Creek Watershed district's rate control and water quality treatment <br />requirements. The replacement of existing sanitary sewer and water, as necessary <br />will be completed and funded by sewer and water utility operating and trunk utility <br />funds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.