My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-24-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
10-24-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 9:10:12 AM
Creation date
12/12/2022 2:14:26 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/24/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Belland Farms Second Addition <br />Development Agreement <br />October 24, 2022 <br /> page 3 <br />iv. The Developer’s engineer shall certify in writing, with an as-built survey, <br />that all grading complies with the approved grading plan prior to issuance <br />of any building permits. <br />v. The Developer shall promptly clear dirt and debris within public rights-of- <br />way and drainage and utility easements resulting from construction by <br />the Developer, its purchasers, builders and contractors within five (5) <br />days after notification by the City. The Developer shall be responsible for <br />all necessary street and storm sewer maintenance, including street <br />sweeping, until all home construction is completed, unless otherwise <br />released by the City. Warning signs shall be placed when hazards <br />develop in streets to prevent the public from traveling on them, including <br />detour signs if necessary. If and when the streets become impassable, <br />such streets shall be barricaded and closed. The Developer shall maintain <br />a smooth, hard driving surface and adequate drainage on all temporary <br />streets. <br />c. Final street grading, subbase, gravel base, concrete curb and gutter, and <br />bituminous base and wear course, street signs and striping shall be furnished <br />and installed. <br />d. Sidewalks, trails and street lighting shall be installed within 6 months of the <br />bituminous base course. Extensions may be approved by the City Engineer, due <br />to weather conditions, upon receipt of a written request in writing by the <br />Developer to the City. In no case shall such extension extend beyond one year <br />from the date of installation of bituminous base course. The Developer shall be <br />responsible for maintenance and repair of sidewalks until the project accepted <br />by the City, the punch list is complete and the RCWD permit is closed. <br />e. Storm sewers, when determined to be necessary by the City Engineer, including <br />all necessary laterals, catch basins, inlets and other appurtenances, shall be <br />furnished and installed. <br />f. Sanitary sewer mains, laterals or extensions, including all necessary building <br />services and other appurtenances, shall be furnished and installed. <br />g. Water mains, laterals or extensions, including all necessary building services, <br />hydrants, valves and other appurtenances, shall be furnished and installed. <br />h. The Developer shall place iron monuments at all lot, block, and outlot corners <br />and at all other angle points on boundary lines consistent with the final plat. <br />Iron monuments shall be placed after all street and lawn grading has been <br />completed in order to preserve the lot markers for future property owners. Lot <br />corner irons on the back property line shall be installed so that the top of the
The URL can be used to link to this page
Your browser does not support the video tag.