My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-24-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
10-24-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 9:10:12 AM
Creation date
12/12/2022 2:14:26 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/24/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meter Testing (Our Cost, Delivered to Minneapolis) 100.00$ 5/8" - 3/4" Meter Test <br />150.00$ 1" Meter Test <br />250.00$ 1-1/2" - 2" Meter Test <br />Water Meter Rental 600.00$ Deposit <br />25.00$ /Month <br />Additional Accessories 25.00$ /Month <br />Water Usage Fee 5.00$ /Thousand Gallons <br />Water Use Violation 25.00$ 1st Violation <br />50.00$ 2nd and Subsequent Violations <br />Trunk Charge <br />Sanitary Sewer 1,695.00$ /Unit <br />1,630.00$ /Unit <br />Water 2,435.00$ /Unit <br />2,341.00$ /Unit <br />Availability Charge <br />City Sewer (CSAC)1,586.00$ /SAC Unit <br />1,525.00$ /SAC Unit <br />City Water (CWAC)1,532.00$ /SAC Unit <br />1,473.00$ /SAC Unit <br />The Lateral Service Connection Fee shall be in addition to the City Trunk Utility Connection Fees. <br />Lateral Service Connection Fees <br />If the lot or tract of land, or portion thereof, to be served by a lateral connection has not been <br />assessed for the cost of construction, then the applicant shall pay, upon hook-up, a lateral connection <br />in accordance with Resolution No. 02-149 (Bisel Amendment) based on the following front foot <br />charges: <br />City Trunk Utility Connection Fees - the Trunk Utility Connection Fee consists of two components: a Trunk <br />Charge and an Availability Charge. <br />The trunk charge shall be paid at the time of subdivision approval or at the time of hook-up, <br />whichever is first. Residential trunk charges are based on one unit per dwelling unit. <br />Commercial/Industrial/Institutional (CII) trunk charges are based on a factor of 2.92 units per acre. <br />For residential properties, the availability charge shall be paid at the time of subdivision approval or <br />at the time of hook-up, whichever is first. Commercial/Industrial/Institutional availability charges <br />shall be paid at the time of building permit. Fees are based on the number of sanitary access charge <br />(SAC) units assigned by Metropolitan Council Environmental Services (MCES). Residential uses <br />shall be assigned one unit per dwelling unit unless otherwise noted by MCES.
The URL can be used to link to this page
Your browser does not support the video tag.