My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-24-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
10-24-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 9:10:12 AM
Creation date
12/12/2022 2:14:26 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/24/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />AGENDA ITEM 6B <br /> <br />STAFF ORIGINATOR: Diane Hankee, City Engineer <br /> <br />MEETING DATE: October 24, 2022 <br /> <br />TOPIC: Consider Resolution 22-124, Authorize the Preparation of <br />Plans and Specs, 2023 Street Rehabilitation Project <br /> <br />VOTE REQUIRED: 3/5 <br /> <br />INTRODUCTION <br /> <br />Staff is requesting Council authorization to prepare plans and specifications for the 2023 Street <br />Rehabilitation Project. <br /> <br />BACKGROUND <br /> <br />The 2023 Street Rehabilitation Project is generated from the City’s Pavement Management <br />Program and associated Capital Improvement Plan. The Pavement Management Program evaluates <br />the condition of the roadways and provides recommendations for maintenance for the City’s entire <br />network of roadways. The proposed improvements included in the 2023 Street Rehabilitation <br />Project are: <br /> <br />Full Depth Reclamation (approximately 0.25 miles) – Black Duck Drive (from 200 ft north <br />of Crystal Court to the cul-de-sac). <br /> <br />Mill and Overlay (approximately 1.29 miles) – Black Duck Drive (from 100 ft south of East <br />Shadow Lake Drive to 200 ft north of Crystal Court), Crystal Court, Mallard Lane, East <br />Shadow Lake Drive (from Black Duck Drive to the cul-de-sac (excluding the recently <br />reconstructed intersection of East Shadow Lake Drive at Lantern Lane), Lantern Lane, <br />Lantern Circle, and Partridge Place. <br /> <br />Within the mill and overlay and full depth reclamation areas, gate valves will be replaced if they <br />have not been previously repaired. Black Duck Drive south of the East Shadow Lake Drive <br />intersection is planned to be overlaid in 2024. Part of Black Duck Drive and Black Duck Circle <br />have 6-inch diameter water main, which likely has saddled services. Saddled services of this age <br />and material have historically been corroded. Thus, we plan to include a few service repair <br />investigations in the 2023 project scope to prepare for the 2024 project. <br /> <br />WSB & Associates has submitted a proposal to complete the topographic survey, plans and <br />specifications, and provide bid documents for the 2023 Street Rehabilitation Project for a total not <br />to exceed the amount of $55,058.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.