Laserfiche WebLink
<br />\\metro-inet\linolakes\Shared\Community Development\Projects\Capital Improvement Projects\2023 Street Rehabilitation <br />(Blackduck)\Staff Reports\20221024 CC Authorize Plans & Specs\4. 2023 Street Rehab - Design Proposal.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM October 19, 2022 <br /> <br /> <br />City of Lino Lakes <br />Mr. Michael Grochala <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br /> <br />Re: Proposal to Complete 2023 Street Rehabilitation Project Construction Plans <br />and Specifications <br /> <br />Dear Mr. Grochala: <br /> <br />WSB and Associates is providing this proposal for the design and bidding services for <br />the 2023 Street Rehabilitation Project. The local streets designated for rehabilitation <br />were determined by their OCI ratings established in the City’s Pavement Management <br />Study. A summary of the project scope is described as follows: <br /> <br />Full Depth Reclamation (approximately 0.25 miles) – Black Duck Drive (from 200 ft <br />north of Crystal Court to the cul-de-sac). <br /> <br />Mill and Overlay (approximately 1.29 miles) – Black Duck Drive (from 100 ft south of <br />East Shadow Lake Drive to 200 ft north of Crystal Court), Crystal Court, Mallard <br />Lane, East Shadow Lake Drive (from Black Duck Drive to the cul-de-sac (excluding <br />the recently reconstructed intersection of East Shadow Lake Drive at Lantern <br />Lane), Lantern Lane, Lantern Circle, and Partridge Place. <br /> <br />Project scope also includes curb and gutter replacement as necessary, gate valve <br />replacement, and water service condition reviews. Based on the project scope, WSB <br />would perform the following tasks: <br /> <br />I. Prepare Final Project Plans <br />Final construction plans will be prepared indicating the project locations <br />and plan view sheets for the areas to be reclaimed or milled and overlaid. <br />Surveyed topographic information will be used to prepare the construction <br />plans. Base drawing information will include GSOC design locates, curb <br />inspection, city parcel map information and record plans. <br /> <br />II. Final Quantities <br />An Engineer’s Opinion of Probable Cost will be completed with the final <br />construction plans. <br /> <br />III. Prepare Permits, Specifications and Bidding Documents <br />WSB will assist the City in preparing permit application(s) and/or approval <br />requests and will assist the City with submitting the applications/approval <br />requests to the appropriate regulatory agencies. <br />