My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-14-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
11-14-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 9:17:11 AM
Creation date
12/12/2022 2:14:46 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/14/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meter Testing (Our Cost, Delivered to Minneapolis) <br />$ <br />100.00 <br />5/8" - 3/4" Meter Test <br />$ <br />150.00 <br />1" Meter Test <br />$ <br />250.00 <br />1-1/2" - 2" Meter Test <br />Water Meter Rental <br />$ <br />600.00 <br />Deposit <br />$ <br />25.00 <br />/Month <br />Additional Accessories <br />$ <br />25.00 <br />/Month <br />Water Usage Fee <br />$ <br />5.00 <br />/Thousand Gallons <br />Water Use Violation <br />$ <br />25.00 <br />1st Violation <br />$ <br />50.00 <br />2nd and Subsequent Violations <br />City Trunk Utility Connection Fees - the Trunk Utility Connection Fee consists of two components: a Trunk <br />Charge and an Availability Charge. <br />Trunk Charge <br />The trunk charge shall be paid at the time of subdivision approval or at the time of hook-up, <br />whichever is first. Residential trunk charges are based on one unit per dwelling unit. <br />Commercial/Industrial/Institutional (CII) trunk charges are based on a factor of 2.92 units per acre. <br />Sanitary Sewer $ 1,695.00 /Unit <br />$ 1,630.00 Mitt <br />Water $ 2,435.00 //tUrn'it <br />$ q,34 i.00 AJ*4 <br />Availability Charge <br />For residential properties, the availability charge shall be paid at the time of subdivision approval or <br />at the time of hook-up, whichever is first. Commercial/Industrial/Institutional availability charges <br />shall be paid at the time of building permit. Fees are based on the number of sanitary access charge <br />(SAC) units assigned by Metropolitan Council Environmental Services (MCES). Residential uses <br />shall be assigned one unit per dwelling unit unless otherwise noted by MCES. <br />City Sewer (CSAC) <br />City Water (CWAC) <br />$ 1,586.00 /SAC Unit <br />$ 1525.00 is non <br />$ 1,532.00 /SAC Unit <br />1,473.00 n S C r ni <br />The Lateral Service Connection Fee shall be in addition to the City Trunk Utility Connection Fees. <br />Lateral Service Connection Fees <br />If the lot or tract of land, or portion thereof, to be served by a lateral connection has not been <br />assessed for the cost of construction, then the applicant shall pay, upon hook-up, a lateral connection <br />in accordance with Resolution No. 02-149 (Bisel Amendment) based on the following front foot <br />charges: <br />
The URL can be used to link to this page
Your browser does not support the video tag.