My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-14-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
11-14-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 9:17:11 AM
Creation date
12/12/2022 2:14:46 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/14/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Escrow deposits can be submitted through one of the following procedures: <br />a. Escrow can be paid to the City upon execution of an agreement signed by both the payee and the <br />City. <br />b. The title company or lending institution can hold the escrow upon execution of an agreement signed <br />by both the title company or lending institution and the City. <br />A partial release, of a multi -item escrow, will be charged a $75.00 non-refundable administrative fee. <br />RIGHT-OF-WAY MANAGEMENT <br />Excavation Permit Fees <br />Hole (includes administration, plan review, $ 125.00 <br />inspection, testing and mapping) <br />Trench (includes administration, plan review, $ 70.00 /100 Lineal Feet plus Hole Fee <br />inspection, testing & mapping) <br />Obstruction Permit Fee <br />Includes administration, recording, review & $ 50.00 Plus $0.051 Lineal Foot <br />inspection <br />Permit Extension Fee <br />Includes administration, recording & review $ 55.00 <br />Delay Penalty <br />For up to three days of non -completion and non- $ 60.00 <br />prior notice before specified date. After three days <br />an additional charge of $10.00 per day will be <br />levied. <br />Degradation Fee <br />Degradation Fee Formula: <br />This formula covers degradation for depreciation caused by intrusion into the right-of- <br />way. The depreciation applies to the original surface of the right-of-way and to the <br />overlays and seal -coats applied to the surface. The formula includes life expectancy <br />schedules for each and has an estimated cost per square yard based on the quality of the <br />right-of-way surface required for different levels of traffic. This formula creates a <br />degradation fee which is determined by the cost per square yard for street, overlay, and <br />seal -coat, multiplied by the depreciation schedule, multiplied by the area of the street <br />patch. <br />Degradation Fee: <br />(cost per square yard for street overlay and seal -coat x depreciation schedule rates) x area <br />of street patch = degradation fee <br />
The URL can be used to link to this page
Your browser does not support the video tag.