My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-14-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
11-14-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 9:17:11 AM
Creation date
12/12/2022 2:14:46 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/14/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL AGENDA ITEM 6B STAFF ORIGINATOR: Diane Hankee, City Engineer <br />MEETING DATE: November 14, 2022 <br /> TOPIC: Consider Resolution 22-138, Authorize the Preparation of Plans and Specs, Pheasant Run Reconstruction Project <br /> <br />VOTE REQUIRED: 3/5 <br /> INTRODUCTION Staff is requesting Council authorization to prepare plans and specifications for the Pheasant Run Reconstruction Project. <br /> BACKGROUND On October 10, 2022, the City Council approved a revision to the 2020-2024 Street Reconstruction Plan which added the reconstruction of the Pheasant Run cul-de-sac north of Birch Street (CSAH <br />34). The Overall Condition Index rating of the street is 11 on a scale of 0 – 100 where 0 is a deteriorated condition and 100 is good condition. The utilities is Pheasant Run are the oldest in the City and the watermain is undersized compared to current standards for improved service pressure and circulation. <br />The project includes roadway reconstruction, drainage improvements and new curb and gutter on Pheasant Run north of Birch Street. The utility work will include replacing or rehabilitating the existing sanitary sewer along Pheasant Run and up to Captain’s Place. Upsizing the existing potable water main from 6 to 8 inch diameter along Pheasant Run and up to Captain’s Place and looping back in at Blackduck Drive. Installing a new 12-inch diameter raw water main from Well No. 5 to <br />Birch Street as outlined in the comprehensive plan. WSB & Associates has submitted a proposal to complete the topographic survey, plans and specifications, drainage design, permitting, and provide bid documents for the 2023 Pheasant Run Reconstruction Project for a total not to exceed the amount of $67,788.00. <br /> The estimated total project cost including overhead is $1,270,000.00. Funding for the project is expected to be from 2021 Street Reconstruction Bonds, the Water and Sewer Operating Funds, the Trunk Water Fund, and the Street Reconstruction Fund. <br />The project schedule: Authorize Preparation of Plans and Specifications November 14, 2022 Order Improvement, Approve Plans and Specs, Authorize Ad for Bids January 9, 2023 City Opens Bids February 21, 2023
The URL can be used to link to this page
Your browser does not support the video tag.