My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-05-2022 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
12-05-2022 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 5:18:42 PM
Creation date
12/12/2022 2:15:08 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/05/2022
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 6: Implementation Measures and Strategies | 24Otter Lake Road Master Plan <br />WATER <br />The City’s 2040 Comprehensive Plan and Water System Model identify the need for a 16-inch diameter <br />trunk water line running north south through the development site, which will extend and be part of a <br />broader future trunk water line loop crossing I-35E. Smaller size watermain, 8 to 12-inch diameter, will be <br />looped throughout the commercial and industrial sites. The City’s water supply and storage capacities <br />will be expanded to keep pace with development and demand on the water system and in accordance <br />with the City’s 2040 Comprehensive Water Supply Plan. <br />Utilities <br />SANITARY SEWER <br />The City’s 2040 Comprehensive Plan identifies the need for a 27 to 18-inch diameter trunk sanitary sewer <br />flowing southward and extending from south to north through the development site. This new trunk <br />sanitary sewer will serve City Sanitary District 5 and will discharge to Metropolitan Council Environmental <br />Services (MCES) Interceptor 802325 through a new flow meter vault currently under design and located <br />near the intersection of Main Street and 24th Avenue. Smaller size sanitary sewer laterals, 8 to 12-inch <br />diameter, will be extended from the trunk to the commercial and industrial sites. <br />CHAPTER 6: IMPLEMENTATION MEASURES AND STRATEGIES <br />As the City of Lino Lakes moves forward with development proposals for the study area, this Master Plan <br />is meant to be a guide for development. In order to implement this plan and allow for development to <br />occur, the Otter Lake Road extension needs to be constructed, zoning and land use changes will occur, <br />environmental applications need to be pursued and economic development strategies need to be <br />developed. This chapter outlines several implementation measures that need to occur in order to achieve <br />full development of the study area.""""""""""""""""""Main StInterstate 35E16''12''16'' <br />27''24''Document Path: K:\019206-000\GIS\Maps\019206 Master Plan Constraints\Utilities Map - Letter Date Saved: 10/31/2022¯1 inch = 800 feet <br />0 800 <br />FeetOtter Lake Road Master Plan <br />City of Lino Lakes <br />Utilities Map <br />Parcels <br />Pipeline ROW <br />Frontage Road <br />35E Pipe Crossing" <br />Existing Watermain <br />MCES Interceptor" <br />Trunk Sanitary Sewer" <br />Trunk Watermain
The URL can be used to link to this page
Your browser does not support the video tag.