Laserfiche WebLink
Alignment Alternatives <br />Alternative 1 <br />•Splits parcels under same ownership, creating an <br />undesirable configuration for landowner <br />•Minimum access road construction <br />•Difficult to construct over pipeline <br />•Wetland impacts <br />Alternative 2 <br />•Alignment splits Bernier, Dale, and Winter <br />properties –same as alternative 1 <br />•Maximizes larger contiguous parcels <br />•Fewer and shorter access road construction and <br />utility extensions, which reduces wetland impacts <br />•Minimizes construction over pipeline <br />•Least impacts to wetlands <br />Alternative 3 <br />•Does not allow access to northern lots—more <br />access roads, longer utility extensions, additional <br />wetland impacts <br />•Highest wetland impacts <br />•Development would be more challenging <br />10