My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-28-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
11-28-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 9:36:01 AM
Creation date
12/14/2022 9:30:07 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/28/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />151 <br />(a) Properly fence any pit or excavation, and barricade entrances to prevent the general <br />public from depositing garbage or refuse. <br /> <br />(b) Slope the banks, and otherwise guard and keep any pit or excavation in such <br />condition as not to be dangerous because of sliding or caving banks. <br /> <br />(c) Properly drain, fill, or level off any pit or excavation so as to make the same safe <br />and healthful as the City may determine. <br /> <br />(d) Limit the depth of such excavation to an elevation no lower than the minimum floor <br />elevation for building construction as established by the City Engineer, so as not to diminish <br />development potential of the parcel. <br /> <br />(e) Limit any fill material to clean fill, defined as rock, sand, gravel, clay, or other like <br />and similar non-decomposable material. Concrete, asphalt, metal, wood, and other debris shall <br />be prohibited. <br /> <br />(f) Require that all decomposable material, or other unsuitable foundation material, be <br />removed from an area before deposition of fill begins. <br /> <br />(g) Prepare a site plan showing existing and proposed grade elevations and effect of <br />storm water drainage on adjacent areas. <br /> <br />(h) Specify a time when the excavation or land reclamation project shall be completed. <br /> <br />(i) Place a minimum of four (4) inches of top soil over the completed project and <br />establish ground cover in a time period consistent with the City’s stormwater management and <br />pollution prevention plan. <br /> <br />(j) Reimburse the City for the cost of periodic inspections by the City for the purpose <br />of determining that the terms under which the permit has been issued are being complied with. <br /> <br />(k) Implement the tree preservation plan. <br /> <br />(l) Post a form of security as determined by the City Engineer to cover potential City <br />cost of repairing or cleaning any highways, streets, or other public ways within the City made <br />necessary by the special burden resulting from transporting thereon by the applicant material to <br />or from the site, the amount of such cost to be determined by the Council; and conditioned <br />further to comply with all the requirements of this ordinance and the particular permit, and to <br />save the City free and harmless from all suits or claims for damages resulting from the negligent <br />excavation, removal, storage, or filling of rock, sand, dirt, gravel, clay, or other like material <br />within the City. <br /> <br />(m) Other conditions deemed appropriate to the application by the City Engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.