Laserfiche WebLink
<br />174 <br />3. Utility connection. All grid connected systems shall have an agreement with the <br />local utility prior to the issuance of a building permit. A visible external disconnect shall be <br />provided if required by the utility. <br /> <br />(k) Abandonment. If a solar energy system remains nonfunctional or inoperative for a <br />continuous period of one (1) year, the system shall be deemed to be abandoned and shall <br />constitute a public nuisance. The owner shall remove the abandoned system at their expense after <br />a demolition permit has been obtained. Removal includes the entire structure including <br />transmission equipment. <br /> <br />(l) Permit. A building permit shall be obtained for any solar energy system prior to <br />installation. A building permit submittal shall include the following: to scale site plan, <br />manufacturers and installation specifications, a complete structural review worksheet for <br />residential roof mounted solar arrays and any additional information requested by City staff <br />and/or the Building Official. <br />