Laserfiche WebLink
<br /> <br />Shenandoah Improvements Feasibility Report <br />City of Lino Lakes, MN <br />WSB Project No. 018901-000 Page 6 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />InfoSWMM modeling was also generated for the proposed project improvements. <br />This was done to understand the benefits to outflow rates and flood levels in the <br />pond system that may be realized as a result of this project. Generally, it was found <br />that adding storage d ownstream in Shenandoah Park resulted in flow rate decreases <br />under Birch St and reductions in flood levels through the system. These flood