My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-04-2023 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
2023 Park Board Packets
>
01-04-2023 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 3:18:18 PM
Creation date
12/29/2022 1:29:18 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
01/04/2023
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />4 <br /> <br /> <br />Mr. Bechel discussed the Hugo Park and the different surface products used for the <br />playground besides wood fiber. Mr. DeGardner stated upgrading to rubberized surfacing <br />would take away a significant amount of playground equipment due to cost. Mr. Bechel asked <br />about donating options. <br /> <br />Mr. Kusterman stated if we told the residents how much a new playground surface would <br />cost, maybe an organization could raise the additional money. <br /> <br />C. Brainstorming Session <br />Pat Huelmann, Park Board Chair, suggested we utilize the October Park Board meeting as an <br />opportunity to brainstorm and potentially identify some short- and long-term projects <br />throughout the parks and trails system. <br />Some ideas include: <br /> <br />• Choose a couple of parks that have significant items left from their masterplan or might need <br />a new master plan <br />• Identify park needs beyond our well-known playground replacement (more hard courts, <br />shelters/gazebos/tables/benches) <br />• Identify critical trail needs (both repair or additions) <br />• Think outside the box on projects too big for the annual allotment (hard courts on skating rink, <br />major trail segments, totally new features) <br />Mr. Huelman explains his ideas/vision. <br /> <br />Mr. Gooder stated not ever ything needs to be updated at each park. <br /> <br />Mr. Gooder would like each park and trail branded with Lino Lakes signs, update at least 2 <br />parks per year, and create trails. <br /> <br />Mr. Huelman discusses Marshan Park and several other trails that need to be created/updated. <br />Would like to come up with a list of trails to be created and share with City Council. <br /> <br />Mr. Kusterman would like a list of parks and trails for a 5-10 year plan that goes before City <br />Council. <br />
The URL can be used to link to this page
Your browser does not support the video tag.