Laserfiche WebLink
2 <br />while maximizing the total phosphorous removed. With these concepts, there is also room for <br />greenway system benefits that could increase trail connectivity between Arrowhead Drive and <br />Birch Street. <br /> <br />Future implementation of the concepts may include a grant application to BWSR and a local <br />match shared by RCWD and the City. <br /> <br /> <br />ENVIRONMENTAL DIRECTION <br /> <br />Staff recommends acceptance of the report and supports future improvements based on concepts <br />3 and 4 as described in the report. <br /> <br />Staff is seeking Environmental Board acceptance of the Shenandoah Improvements Feasibility <br />Report and support for future improvements to Shenandoah Park based on concepts described. <br /> <br /> <br />ATTACHMENTS: <br /> <br />1. Shenandoah Park Aerial Photo <br />2. Shenandoah Improvements Feasibility Report <br /> <br />