Laserfiche WebLink
4 <br />Building Setbacks <br />-From Local or <br />Minor Collector <br />Streets <br />25ft 25ft 30ft <br />25ft from curb not <br />ROW and <br />15ft Lot 1 & 15 <br />-From Major <br />Collector or <br />Arterial Streets <br />40ft 40ft 40ft 100ft <br />-Rear <br />--Principal 25ft 25ft 35ft from LDR 25ft <br />-Accessory 5ft 5ft 5ft NA <br />-Side <br />--Principal 10ft 10ft 10ft 6.5ft <br />--Accessory 5ft 5ft 5ft 6.5ft <br />Side or Rear Buffer <br />Adjacent to <br />Collector <br />15ft 15ft 20ft Shall be provided <br />Impervious <br />Surface 65% 65% 65% TBD <br />aRed text indicates need for PUD flexibility <br />bMinimum Lot Size. Lot size shall consist of contiguous buildable land as defined by <br />City Code Section 1007.001(2). The minimum lot size cannot include oversized <br />easements needed for stormwater management facilities. <br />cLot sizes and depths are based on measurements taken to the curb of the private drive, <br />not a public road right-of -way line. These lot sizes also include stormwater management <br />facilities. <br />Staff Comments: <br />1.As proposed, the PUD concept plan is most comparable to the R-2 Single Family <br />detached home requirements. PUD flexibility would be required for lot sizes, lot <br />widths, lot depth, and side setbacks. <br />2.Landscape buffer and screening are required along all perimeters of the lot.