Laserfiche WebLink
6. The proposed development shall be served with an adequate and safe sanitary sewer <br /> system. <br /> The proposed earth moving and stockpiling does not require service by sanitary <br /> sewer. Municipal sanitary sewer is located along is located along Phelps Road and <br /> can be extended to the property should the applicant wish to connect in the future. <br /> 7. The proposed development shall not result in the premature expenditures of City <br /> funds on capital improvements necessary to accommodate the proposed development. <br /> The proposed earth moving and stockpiling operation will not expend City funds. <br /> 8. Fire prevention and fighting equipment acceptable to the Board of Fire Underwriters <br /> and City Council shall be readily available when any activity involving the handling <br /> or storage of flammable or explosive materials is carried on. <br /> The proposed earth moving and stockpiling operation does not involve any activity <br /> handling or storing flammable or explosive materials. <br /> BE IT FURTHER RESOLVED by the City Council of Lino Lakes in addition to the <br /> administrative requirements of an interim use permit,the following standards of Section <br /> 1007.051(4), are being met, as outlined in the staff report dated January 11, 2023, <br /> prepared for review for the Planning and Zoning Board of Lino Lakes: <br /> BE IT FURTHER RESOLVED by The City Council of the City of Lino Lakes hereby <br /> approves the interim use permit for earth moving and stockpiling located on Phelps Road <br /> (PID#24-31-22-42-0004)) subject to the following conditions: <br /> 1. Fill stockpiles shall be limited to the areas identified in the plans prepared by <br /> Stantec, dated December 15, 2022, and received by the City on December 15, <br /> 2022, and any revisions to the plans approved by the City. <br /> 2. Comments from the City Engineer letter dated January 4,2023, shall be <br /> addressed. <br /> 3. Comments from the City Environmental Coordinator letter dated January 4, 2023, <br /> shall be addressed. <br /> 4. The vehicles accessing or exiting the site shall not track sediment on Phelps Road <br /> or Otter Lake Service Road. Any street tracking that does occur from vehicles <br /> entering or leaving the site must be swept within one calendar day of discovery. <br /> The sediment removal facilities on site, such as the gravel entrance, must be <br /> maintained to prevent tracking. <br /> 5. Fill stockpiles shall be at least 50-ft from the road easement and property lines. <br /> 6. The total fill stockpiles shall not exceed 210,000 square feet in area. <br /> 7. The northwestern stockpile shall have a maximum top elevation of 925,the <br /> northeastern stockpile shall have a maximum top elevation of 924, and the <br /> southern fill stockpile shall have a maximum top elevation of 922. <br /> 8. Maximum side slope of fill stockpiles to be 4:1. <br /> 4 <br />