My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/08/2023 P & Z Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2023
>
03/08/2023 P & Z Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 11:55:26 AM
Creation date
3/3/2023 10:57:32 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/08/2023
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum <br /> <br />To: Katie Larsen, Lino Lakes City Planner <br /> <br />From: Kelsey Gelhar PE, WSB <br /> Diane Hankee PE, WSB, Lino Lakes City Engineer <br /> <br />Date: March 1, 2023 <br /> <br />Re: 399 Elm Street (Centennial Middle School) <br /> Plan Review <br /> 022290-000 <br /> <br /> <br />WSB reviewed the site plans and supporting documents for the project located at 399 Elm Street <br />(Centennial Middle School) in Lino Lakes, MN, received February 10, 2023. Comments were <br />made on the following documents: <br /> <br />• Boundary, Location, Topographic and Utility Survey prepared by Sunde Land Surveying, <br />dated February 9, 2023, received February 10, 2023. <br />• Centennial Middle School – I.S.D. #12 Tennis Court Relocation and Parking Lot Addition <br />site plans prepared by Larson Engineering, Inc., dated February 7, 2023, received <br />February 10, 2023. <br />• Centennial Middle School Tennis Court Relocation and Parking Lot Addition Stormwater <br />Calculations prepared by Larson Engineering, Inc., dated February 7, 2023, received <br />February 10, 2023. <br />• Geotechnical Evaluation Report – Centennial Middle School Pavement Improvements <br />prepared by Braun Intertec, dated December 22, 2022, received February 10, 2023. <br /> <br />The following review comments should be responded to in writing by the applicant. <br /> <br />Engineering <br /> <br />• General <br /> <br />The plans include converting existing tennis courts to a parking lot and converting an <br />existing parking lot to tennis courts. All of the work proposed is within the 399 Elm Street <br />(Centennial Middle School) property. <br /> <br />Comments: <br />1. (3/1/2023) Applicant to verify if the concrete walk area by the existing tennis <br />courts/proposed parking lot is being removed and replaced. It is shown as <br />the same hatch on all sheets. <br />2. (3/1/2023) Applicant to verify if drain tile in the proposed tennis courts is low <br />enough to avoid conflicts with existing and rerouted electrical work. <br />3. (3/1/2023) Contractor to note that any tree removals may be impacted by the <br />U.S. Fish & Wildlife Service classification of the northern long-eared bat as <br />endangered. This classification may require that tree removal within the <br />project area not take place until after the new NLEB determination key is
The URL can be used to link to this page
Your browser does not support the video tag.