Laserfiche WebLink
0.45%2.0%0.85%2.0%0.85%2.0%0.85%2.0%0.85%2.0%0.85%2.0%0.85%0.45%0.45%0.45%0.45%0.45% <br />0.45%0.45%903.7 TC*903.2 GL*903.6 TC*903.1 GL*903.5 TC*903.0 GL*903.4 TC*902.9 GL*905.0 TC*904.5 GL*905.9 TC*905.4 GL*905.82 TC/GL904.00 C904.00 C/B904.54 C904.54 C905.73 C905.73 C906.27 C906.27 C905.90 TC905.40 GL906.05 TC905.55 GL903.87 B904.41 B904.41 C/B903.87 B906905905904904905906905904904903905 <br />906.30 TC905.80 GL906.30 TC905.80 GL43524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.com3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.0NORTH102040DRAWING NUMBERCPROJECT #1222066.000DRAWN BYDATE02-07-2023DRAWING TITLEDateRevision DescriptionDRAWINGSCONSTRUCTIONKK/JMJNCHECKED BYMADISON, WIMILWAUKEE, WIMAPLE GROVE, MNTHIS DRAWING IS PROPERTY OFNEXUS SOLUTIONS, LLC. USE OR REPRODUCTIONWITHOUT WRITTEN PERMISSION IS PROHIBITED.Nexus Solutions, LLCJUSTIN NIELSEN, P.E.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.PRINTED NAME:SIGNATURE:DATE: REG. NO.52687CENTENNIAL MIDDLE SCHOOL ISD#12TENNIS COURT RELOCATIONAND PARKING LOT ADDITION399 ELM STREETLINO LAKES, MN 5501402/07/2023P:\Projects\Projects - 2022\12226066 - Centennial MS Tennis Courts\C. Design\Drawing Files\12226066 C300-C301 - Grading.dwgLEGEND1.See Sheet C301 for Erosion Control Notes.EROSION CONTROL NOTESGRADING NOTESTENNIS COURTRELOCATIONGRADING AND EROSIONCONTROL PLANC300PROPOSED CONTOURS - MAJOR INTERVALGRADE BREAK LINEPROPOSED CONTOURS - MINOR INTERVAL949950950EXISTING CONTOURS2.0%950.00 TC949.50 GLGRADE SLOPESPOT ABBREVIATIONS:SEDIMENT LOG, SEE DETAIL 12/C501RIP-RAP / ROCK CONST. ENTRANCEINLET PROTECTION, SEE DETAIL 11/C501CONCRETE WASHOUT STATION(LOCATE DURING CONSTRUCTION)TC - TOP OF CURBGL - GUTTER LINEB - BITUMUNOUSC - CONCRETEOF - OVERFLOWTW - TOP OF WALLBW - BOTTOM OF WALL (F/G)(*) - EXISTING TO BE VERIFIEDTS - TOP OF STEPBS - BOTTOM OF STEPEROSION CONTROL BLANKET, SEE DETAIL 13/C501KEY NOTESKEY NOTESRIP RAP AT CURB CUT, SEE DETAIL 9/C501RIP RAP AT RAIN GUARDIAN STRUCTURE, SEE DETAIL 2/C502INFILTRATION BASIN, SEE DETAIL 1/C502ROCK CONSTRUCTION ENTRANCE, SEE DETAIL 8/C50112341.See Sheet C301 for Grading Notes.NOT TO SCALEKEY PLAN