Laserfiche WebLink
Enter A Summary of Total Project Costs: <br />Enter the Eligible I&I Costs that your City incurred between May 31, 2017 and May 30, 2018 (Column A): <br />Type of work: <br />(A) Total <br />Project Costs: <br />(B) Covered: 50% <br />of Project Costs <br />(C) % Eligible <br />for funding <br />(D)Amount Eligible <br />For Grant Funding <br />1. Pipe Lining and Replacement X 50% = $ 0.00 X 50% = $ 0.00 <br />2. Pipe Joint Sealing and chimney Seals X 50% = $ 0.00 X 100% = $ 0.00 <br />3. Manholes – Lining, replacement X 50% = $ 0.00 X 50% = $ 0.00 <br />4. Manhole Sealing joints, castings, cover X 50% = $ 0.00 X 100% = $ 0.00 <br />5. Flood Mitigation X 50% = $ 0.00 X 10% = $ 0.00 <br />6. Cross Connection Elimination X 50% = $ 0.00 X 100% = $ 0.00 <br />Total: $ 0.00 $ 0.00 $ 0.00 <br />Enter the Eligible I&I Costs that your City incurred between May 31, 2018 and November 1, 2019 (Column A): <br />Type of work: <br />(A) Total <br />Project Costs: <br />(B) Covered: 50% <br />of Project Costs <br />(C) % Eligible <br />for funding <br />(D)Amount Eligible <br />For Grant Funding <br />1. Pipe Lining and Replacement $120,958.50 X 50% = $60,479.25 X 50% = $30,239.63 <br />2. Pipe Joint Sealing and chimney Seals $1,620.00 X 50% = $ 810.00 X 100% = $ 810.00 <br />3. Manholes – Lining, replacement $32,000.00 X 50% = $16,000.00 X 50% = $8,000.00 <br />4. Manhole Sealing joints, castings, cover $8,100.00 X 50% = $4,050.00 X 100% = $4,050.00 <br />5. Flood Mitigation X 50% = $ 0.00 X 10% = $ 0.00 <br />6. Cross Connection Elimination X 50% = $ 0.00 X 100% = $ 0.00 <br />Total: $162,678.50 $81,339.25 $43,099.63 <br />2019 LaMotte Area Street & Utility Improvement Project - CIPP in Place Lining 8"; Structure Lining: Chimney <br />Seals and Sealed Castings installed on all Structures - $162,678.50