Laserfiche WebLink
<br /> <br />2019 LaMotte Area Street & Utility Improvement Project <br />Project Description <br />The project consisted of the lining of approximately 2,300 feet of existing 8-inch and 12-inch <br />sanitary sewer main as well as the lining of 9 sanitary sewer structures and installation of <br />new chimney seals and castings on 9 total sanitary sewer structures. The streets construction <br />took place included: <br />x Lamotte Drive from the south end to the Lino Lakes/Centerville border <br />x Lamotte Circle <br />I/I Mitigation <br />The project reduced infiltration through the lining of existing deteriorating sanitary main and <br />sanitary manholes as well as the installation of new chimney seals and castings on structures. <br />Ownership Value and Useful Life <br />The ownership value is equal to the improvement cost of $162,678.50. The useful life of the <br />improvement is anticipated to be 40 years.