My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-27-2023 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
03-27-2023 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2023 3:28:33 PM
Creation date
3/30/2023 3:17:30 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/27/2023
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />WS – Item 1 <br /> <br />WORK SESSION STAFF REPORT <br />Work Session Item 1 <br /> <br /> <br />Date: March 27, 2023 <br /> <br />To: City Council <br /> <br />From: John Swenson, Public Safety Director <br /> <br />Re: Repair of Aerial 1 (Vehicle # 622) <br /> <br /> <br />Background <br /> <br />During the annual maintenance and inspection of Aerial 1 a hydraulic leak was found in <br />hydraulic swivel. This part is vital to the proper and safe operation of aerial device <br />functionality. <br /> <br />Emergency Apparatus Maintenance (EAM) has prepared the attached estimate for the <br />needed repair based on other repairs that EAM has completed for other fire departments. <br />The total repair is estimated to be $39,942.50. <br /> <br />Aerial 1 is 2004 E-One Bronto that the Fire Division purchased used from Mdewakanton <br />Fire Department in 2017. Aerial 1 is the only aerial apparatus in the Fire Division fleet. <br /> <br />Aerial 1 is not slotted for replacement in current 5 year replacement plan. Staff would <br />anticipate that replacement of Aerial 1 would be in 2034 but this replacement may have <br />to be moved up if repair costs are high. <br /> <br />The costs to purchase a new aerial with similar functionality this year would be <br />approximately $2.2 million. <br /> <br />Staff is recommending that we repair Aerial 1. <br /> <br />Staff is seeking Council direction. <br /> <br />Attachments <br /> <br />Emergency Apparatus Maintenance estimate 3.22.2023 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.