My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-27-2023 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
03-27-2023 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2023 3:28:33 PM
Creation date
3/30/2023 3:17:30 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/27/2023
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum <br />To: Katie Larsen, Lino Lakes City Planner <br />From:Kelsey Gelhar PE, WSB <br />Diane Hankee PE, WSB, Lino Lakes City Engineer <br />Date: March 22, 2023 <br />Re: 399 Elm Street (Centennial Middle School) <br />Plan Review <br />022290-000 <br />WSB reviewed the site plans and supporting documents for the project located at 399 Elm Street <br />(Centennial Middle School) in Lino Lakes, MN, received February 10, 2023. Comments were <br />made on the following documents: <br />•Boundary, Location, Topographic and Utility Survey prepared by Sunde Land Surveying, <br />dated February 9, 2023, received February 10, 2023. <br />•Centennial Middle School – I.S.D. #12 Tennis Court Relocation and Parking Lot Addition <br />site plans prepared by Larson Engineering, Inc., dated March 14, 2023, received March <br />17, 2023. <br />•Centennial Middle School Tennis Court Relocation and Parking Lot Addition Stormwater <br />Calculations prepared by Larson Engineering, Inc., dated March 20, 2023, received <br />March 20, 2023. <br />•Geotechnical Evaluation Report – Centennial Middle School Pavement Improvements <br />prepared by Braun Intertec, dated December 22, 2022, received February 10, 2023. <br />The following review comments should be responded to in writing by the applicant. <br />Larson Engineering, Inc responses and comments from March 17, 2023, shown in red. <br />WSB does not have any new comments or responses to comments as of March 22, 2023. <br />Engineering <br />•General <br />The plans include converting existing tennis courts to a parking lot and converting an <br />existing parking lot to tennis courts. All of the work proposed is within the 399 Elm Street <br />(Centennial Middle School) property. <br />Comments: <br />1. (3/1/2023) Applicant to verify if the concrete walk area by the existing tennis <br />courts/proposed parking lot is being removed and replaced. It is shown as <br />the same hatch on all sheets. <br />(3/17/2023) The hatch in question represents existing concrete that is not to <br />be removed. More existing areas were hatched to illustrate this. <br />2.(3/1/2023) Applicant to verify if drain tile in the proposed tennis courts is low <br />enough to avoid conflicts with existing and rerouted electrical work. <br />Attachment 3: City Engineer Memo
The URL can be used to link to this page
Your browser does not support the video tag.