My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-27-2023 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
03-27-2023 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2023 3:28:33 PM
Creation date
3/30/2023 3:17:30 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/27/2023
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
399 Elm Street (Centennial Middle School) Site Performance Agreement page 3 of 12 <br />this property. <br />Availability Charge <br />For residential properties, the availability charge shall be paid at the time <br />of subdivision approval or at the time of hook-up, whichever is first. <br />Commercial/Industrial/Institutional availability charges shall be paid at the <br />time of building permit. Fees are based on the number of sanitary access <br />charge (SAC) units assigned by Metropolitan Council Environmental <br />Services (MCES). <br />City Sewer (CSAC) $1,525.00 Per SAC Unit <br />Trunk sewer unit charges addressed under this paragraph are in addition to <br />any SAC charges imposed by Metropolitan Council Environmental <br />Services. <br />B.Trunk Water Connection Fees <br />The City established trunk utility connection fees to uniformly distribute <br />the costs of public trunk water infrastructure. The Trunk Utility <br />Connection Fee consists of two components; a Trunk Charge and an <br />Availability Charge. <br />Trunk Charge <br />The trunk charge shall be paid at the time of subdivision approval or at the <br />time of hook-up, whichever is first. The Water Trunk Charge is $2,341.00 <br />per unit. Commercial/Industrial/Institutional (CII) trunk charges are based <br />on a factor of 2.92 units per acre. <br />Availability Charge <br />For residential properties, the availability charge shall be paid at the time <br />of subdivision approval or at the time of hook-up, whichever is first. <br />Commercial/Industrial/Institutional availability charges shall be paid at the <br />time of building permit. Fees are based on the number of sanitary access <br />charge (SAC) units assigned by Metropolitan Council Environmental <br />Services (MCES). <br />City Water (CWAC) $1,473.00 Per SAC Unit. <br />C.Surface Water Management Area Charges <br />The City established a trunk area charge to uniformly distribute the costs <br />of public trunk surface water infrastructure and water quality
The URL can be used to link to this page
Your browser does not support the video tag.