Laserfiche WebLink
Page 1 <br />To: Katie Larsen <br />From: Andy Nelson <br />Date: October 4th, 2022 <br />Re: Environmental Comments/October 4th, 2022/Watermark PUD Concept Plan- <br />Amend #4 <br />1.One option for the additional open space would be to establish park in the <br />north near the property line and use the rest for establishment of mesic prairie. <br />A trail could be added through the prairie area to connect with the park in the <br />north. <br />This would require grading the area flat (aside from the berm on the east <br />perimeter) and preparing for seeding. <br />Any new trees required for buffer and/or screening should be kept east of the <br />crest of the berm, keeping the highpoint of the berm free of trees to allow for <br />future management of the prairie area with fire. <br />Environmental Memo <br />Attachment No. 6: Environmental Coordinator Memo dated 10/4/22