My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-10-2023 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
04-10-2023 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2023 2:24:51 PM
Creation date
4/11/2023 2:23:09 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/10/2023
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY COUNCIL <br />AGENDA ITEM 6A <br /> <br /> <br />STAFF ORIGINATOR: Diane Hankee PE, City Engineer <br /> <br />MEETING DATE: April 10, 2023 <br /> <br />TOPIC: Pheasant Run Reconstruction Project <br />i. Consider Resolution No. 23-22, Accepting bids, Awarding <br />Construction Contract <br />ii. Consider Resolution No. 23-23, Approving Construction <br />Services Contract with WSB & Associates <br /> <br />VOTE REQUIRED: 3/5 <br /> <br />INTRODUCTION <br /> <br />Staff is requesting Council’s consideration to accept bids, award a construction contract, and <br />approve a construction services contract for the Pheasant Run Reconstruction Project. <br /> <br />BACKGROUND <br /> <br />On February 13, 2023, the City Council ordered the project and authorized the advertisement for <br />bid for the Pheasant Run Reconstruction Project. The project is located on Pheasant Run north of <br />Birch Street. The reconstruction includes new curb and gutter, new pavement, and storm sewer <br />replacement. Utility work will also include replacing and rehabilitating the existing sanitary sewer <br />along Pheasant Run, and upsizing the existing potable water main from 6-inch to 12-inch diameter <br />pipe along Pheasant Run and up to Captain’s Place and looping back in at Black Duck Drive. <br /> <br />Bids were received on Tuesday, April 4, 2023. A total of 8 bids were received and are <br />summarized in the following table: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />The low bid was submitted by A-1 Excavating, LLC. in the amount of $886,886.00 which is <br />within the planned budget and is being recommended for award. <br />Contractor Total Base Bid <br />A-1 Excavating, LLC $886,886.00 <br />Northdale Construction Co. $893,877.95 <br />T.A. Schifsky & Sons, Inc. $898,590.53 <br />Kuechle Underground, Inc. $977,286.82 <br />Miller Excavating, Inc. $1,133,333.34 <br />Meyer Contracting, Inc. $1,146,274.01 <br />Dresel Contracting, Inc. $1,337,522.15 <br />Forest Lake Contracting, Inc. $1,398,768.00
The URL can be used to link to this page
Your browser does not support the video tag.