Laserfiche WebLink
<br />reconstruction at this time. Proposed costs are generally consistent with the City’s Five Year <br />Financial Plan. <br /> <br />If the plan is approved and street improvements move forward a feasibility study regarding <br />extension of municipal sewer and water to the Pine Haven area and Red Maple Lane will be <br />prepared. Both areas have smaller lots sizes than typical for on-site systems and/or high water <br />tables. <br /> <br />Street reconstruction bonds cannot be used for the extension of utilities. Any extension of <br />utilities would require a separate funding source and, if assessed, would follow City Charter <br />requirements. <br /> <br />Requested Council Direction <br /> <br />Staff is requesting direction to set the date for the public hearing. <br /> <br />Attachments <br /> <br />1. Draft - 5 year Street Reconstruction Plan Map