My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-01-2023 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
05-01-2023 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 1:07:19 PM
Creation date
4/28/2023 1:05:00 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/01/2023
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WS – Item 1 <br />WORK SESSION STAFF REPORT <br />Work Session Item No. 1 <br />Date: May 1, 2023 <br />To: City Council <br />From: Michael Grochala, Community Development Director <br />Re: NE Area Wetland Prospectus <br />Background <br />The City is considering establishment of a wetland bank on property located east of 35E <br />and north of Main Street. The City has notified the owners of our interest and the owners <br />have responded they would get back to us after consulting with their legal and financial <br />advisors. <br />The establishment of a wetland bank requires three steps which include the following: <br />1.Draft Prospectus. This is a scoping document providing baseline site information, <br />project goals and objectives, site constraints, an initial wetland assessment and <br />proposed mitigation approach. The document is used by regulating agencies to <br />determine if the project has the potential to provide compensatory mitigation for <br />wetland impacts. <br />2.Prospectus. This step provides review agencies with a conceptual overview of the <br />proposed wetland bank. This includes collection of data including hydrology, <br />survey, and vegetative information to support design and credit estimates. Based <br />on this information agencies will make a findings and recommendations regarding <br />the establishment of the bank. <br />3.Mitigation Banking Instrument (MBI). This is the detailed mitigation plan and <br />design information necessary for formal review and approval of the bank. <br />The draft Prospectus was completed in fall of 2021 and is the basis for the City’s interest. <br />Development of the Prospectus and MBI can take up to 18 months to complete. Most of <br />the field work needs to be completed during the growing season – May to October. Any <br />proposed agreement with the property owners will be contingent on approval of the MBI. <br />The work being proposed will assist confirming assumptions made with the draft <br />Prospectus. <br /> Due to the approval timeline staff is recommending moving forward with initial work on <br />the Prospectus during the summer growing season. The entirety of the Prospectus work <br />is approximately $80,000. Staff is proposing to authorize an initial phase of the
The URL can be used to link to this page
Your browser does not support the video tag.