Laserfiche WebLink
<br /> <br /> <br />DATE: June 7, 2023 <br /> <br />TO: Park Board <br /> <br />FROM: Rick DeGardner, Public Services Director <br /> <br />RE: Parks Update <br /> <br />A. Woods of Baldwin Lake Park – The Parks Department planted the landscape beds last week <br />(see attached). Staff will be reviewing the punch list items with the contractor next week. <br />B. Watermark Park – The City Council approved a contract for the playground equipment via <br />Resolution 23-17. We are still finalizing details related to the rubber surfacing. At a minimum, <br />we plan to extend the rubber surfacing to the swing set. Attached is a rendering of the <br />playground area. Construction has commenced and staff is attending weekly on-site <br />construction meetings. Attached is the park shelter that has been ordered. <br />C. City Hall Park Pickleball – The site was prepped and the asphalt was laid a few weeks ago. <br />After the asphalt has cured for 30 days, the painting and striping will commence. The <br />installation of the posts and nets, fencing around the perimeter, and benches are also planned. <br />D. RLE Basketball Court Replacement – Been coordinating this project with CSD No. 12 staff. Work <br />will begin shortly after the last day of school. <br />E. Arena Acres Park - Pickleball Lines – Pickleball lines will be added to the tennis court when the <br />City Hall Park Pickleball courts are being striped. <br />F. Woodridge Drive Trail – The Lyngblomsten development recently constructed their paved trail <br />connecting to the existing trail segment near Woodridge Lane. The existing 200 feet of trail is <br />in poor condition and is being replaced. <br /> <br /> <br /> <br />Attachments <br />Parks Update Map <br />Woods of Baldwin Lake Park Landscaping Plan <br />Watermark Park Playground Area <br />Watermark Park Shelter <br /> <br /> <br />