My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-05-2023 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
06-05-2023 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2023 1:56:38 PM
Creation date
6/7/2023 11:13:39 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/05/2023
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />Setbacks-Side Yard <br />(west and east lot line) Required Proposed <br />Principal Building 10 ft 69 ft & 30 ft <br />Accessory Building 10 ft 177 ft & 36 ft <br />Parking Lot/Driveway 10 ft Shared Lot <br />Line & 48 ft <br />Architectural Plans and Exterior Building Materials <br />The day care facility is two stories with exterior materials consisting of the following: <br />Exterior Material Color (Earth Tone) <br />LP Siding Steely Gray (gray) <br />Manufactured Stonebrick Veneer Olde World (brick red) <br />Wood-Grained Finish <br />Architectural Metal Panels Golden Maple (brown) <br />LP Siding Battens Snowbound (white) <br />Prefinished Metal Matt Black (black) <br />Manufactured Stone Veneer Montana Jasper (dark dray) <br />Fiberglass Shingles Charcoal (black) <br />Standing Seam Roof Metallic Silver (gray) <br />The exterior materials, colors, and percentages are compliant with performance <br />standards. <br />The building height is 33’ 8” to the top roof peak which is less than that maximum 45 ft <br />allowed. <br />A 150sf trash enclosure/storage area is proposed on the north side of the building. <br />Construction details provided on Sheet A5.3 indicate painted smooth face CMU and <br />painted rock face CMU to compliment the principal building. The swing gate is <br />composite decking pickets that has at a minimum opaqueness of at least 80%. The trash <br />enclosure is 6’ 2” in height and has a standing seam metal roof. The trash enclosure <br />meets performance standards. <br />Per Sheet A3.3, the rooftop mechanical equipment is screened by 3’4” high parapets. <br />Per Sheet A0.2, an automatic sprinkler system shall be provided throughout the building <br />for fire suppression.
The URL can be used to link to this page
Your browser does not support the video tag.