Laserfiche WebLink
Page 2 <br />must be in place prior to issuance of grading permit and will be reviewed by staff <br />concurrently with inspection of sediment and erosion control measures. <br />4. Canopy Cover: To account for future development of Outlot A in Milestones <br />Addition, it is recommended that the 4 trees along the west perimeter of the <br />parking lot be moved to areas that will not be impacted by future construction. <br />The entrance road and south infiltration basin seem to have ample space to <br />accommodate these 4 trees. <br />5. Final placement of fire hydrants along west parking lot perimeter may necessitate <br />relocation of 2 trees in the islands. <br />6. Buffer and Screen: The north perimeter of the parking lot requires a double, <br />triangulated row of plants. It appears that the standard could be met by adjusting <br />the placement of the 46 large shrubs shown into the required configuration. <br />7. Maintain a 10 foot radius free of shrubs around tree trunks on north parking lot <br />perimeter to prevent competition. <br />8. A Stormwater Pollution Prevention Plan must be submitted that meets <br />requirements. This will include a concrete washout location, a note that <br />stabilization must be completed within 7 days of construction activity ceasing <br />(due to proximity to impaired waters), and contact info and credentials for the <br />project inspector. <br />9. The Turf Establishment Plan must be updated to match the seeding on the <br />Landscape Plan. Verify that correct Mn DOT seed mix numbers are used. <br />10. The Turf Establishment Plan calls for Mn DOT Seed Mixture 32-261. This <br />should be changed to Mn DOT 33-261. <br />11. Category 3 erosion control blanket is noted for the areas with steeper slopes on <br />the east portion of the site. This should be updated to reflect the 2020 Mn DOT <br />specification numbers to ensure that there is no confusion. The City requires <br />natural net erosion blanket. <br />12. Verify that the trash enclosure is properly sized to accommodate both trash and <br />recycling containers. <br />13. Applicant may want to consider organics recycling for this site. Assistance and <br />grants to establish a recycling program on site may be available through Anoka <br />County’s AnokaBizRecycle Program.