Laserfiche WebLink
1 <br />7 <br />8 <br />E <br />9 <br />T <br />H <br />S <br />T <br />R <br />E <br />E <br />T <br />| <br />S <br />U <br />IT <br />E <br />2 <br />0 <br />0 <br />| <br />S <br />AI <br />N <br />T <br />P <br />A <br />U <br />L, <br />M <br />N <br />| <br />5 <br />5 <br />1 <br />0 <br />1 <br />| <br />6 <br />5 <br />1. <br />2 <br />8 <br />6. <br />8 <br />4 <br />5 <br />0 <br />| <br />W <br />S <br />B <br />E <br />N <br />G <br />. <br />C <br />O <br />M <br />Memorandum <br />To: Katie Larsen, Lino Lakes City Planner <br />From:Diane Hankee PE, Lino Lakes City Engineer <br />Date: June 1, 2023 <br />Re: Milestones Addition & Lil Explorers Childcare Center <br />Plan Review <br />022658-000 <br />WSB reviewed the Milestones Addition preliminary plat and plans for the Lil Explorers Childcare <br />Center site in Lino Lakes, MN, received April 10, 2023. The site is located at Lilac Street east of <br />the intersection of Lilac Street and Apollo Drive (CSAH 12). The lot has frontage along Apollo <br />Drive (CSAH 12) and Lilac Street. Comments were made on the following documents: <br />•Preliminary Plat for Milestones Addition prepared by Sisu Land Surveying & Engineering, <br />revision date May 18, 2023, received May 19, 2023. <br />•Lil Explorers Childcare Center site plans prepared by Sisu Land Surveying & <br />Engineering, revision date May 18, 2023, received May 19, 2023.. <br />•Storm Water Management Plan and Calculations prepared by Sisu Land Surveying & <br />Engineering, revision date May 18, 2023, received May 19, 2023. <br />•Lil X Lino Lakes Drainage Maps prepared by Sisu Land Surveying & Engineering, <br />revision date May 18, 2023, received May 19, 2023. <br />•Autoturn in / out analysis dated May 25, 2023. <br />•Landscape Plan prepared by Midwest Landscapes, dated April 10, 2023, received April <br />10, 2023. <br />• <br />The following review comments should be responded to in writing by the applicant. <br />Applicant responses (5/19/23) in Red <br />WSB review (6/1/23) in Blue <br />Engineering <br />•Grading <br />The plan includes site grading for the proposed parking lot, storm water basins, and <br />childcare center. <br />Comments: <br />1. (5/3/2023) Applicant to revise grading for infiltration basins so that all <br />necessary grading and the High Water Level are within the property. Applicant <br />shall show and label the HWL. <br />(5/19/23) HWL is within property. A portion is on the future outlot to be <br />developed but that is contained in a D&U easement. <br />(5/19/23) Future development will need to meet this same requirement. <br />Attachment 2: City Engineer Memo dated June 1, 2023