Laserfiche WebLink
CITY COUNCIL <br />AGENDA ITEM 6B <br /> <br />STAFF ORIGINATOR: Diane Hankee, PE City Engineer <br /> <br />C. C. MEETING DATE: June 26, 2023 <br /> <br />TOPIC: Consider Resolution 23-59, Order Project, Approve the Plans <br />and Specifications and Authorize the Ad for Bid, 2023 Lake <br />Drive Trunk Water Main Improvements <br /> <br />VOTE REQUIRED: 3/5 <br /> <br /> <br />INTRODUCTION <br /> <br />Staff is requesting Council approval to authorize the ad for bid for the 2023 Lake Drive Trunk <br />Water Main Improvements. <br /> <br />BACKGROUND <br /> <br />On November 28, 2022, the City Council approved the preparation of the plans and specifications <br />for the 2023 Lake Drive Trunk Water Main Improvements project. The City is installing a 12- <br />inch diameter trunk water loop along Lake Drive (CSAH 23) from Forsham Lake Drive north to <br />Park Court. At the meeting, Council asked staff to evaluate an open cut option. We evaluated this <br />option. Open cutting would require removal of trees that currently provide residential screening, it <br />would require the reconstruction of the turn lane, dewatering, impacts to the existing ponds, and it <br />would require additional traffic control. Staff completed a cost estimate for both options and due to <br />the above mentioned items, the open cut option was a higher cost. The project plans have been <br />prepared for the watermain being directionally drilled. <br /> <br />Staff has reached agreement with the property owner for a 20 foot wide easement acquisition along <br />Lake Drive just north of Forsham Lake Drive. <br /> <br />The estimated total project cost, including land acquisition and overhead, is $415,000.00. <br />Funding for the project is expected to be from the Area and Unit Trunk Fund. <br /> <br />The estimated schedule for the project: <br /> <br />Authorize Preparation of Plans and Specifications November 28, 2022 <br />Order Improvement, Approve Plans and Specs, Authorize Ad for Bids June 26, 2023 <br />City Opens Bids August 8, 2023 <br />City Council Awards Contract August 14, 2023 <br />Construction Begins August, 2023 <br />Final Completion November, 2023 <br />