My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-10-2023 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
07-10-2023 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2023 2:22:39 PM
Creation date
7/11/2023 1:35:49 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/10/2023
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />AGENDA ITEM 6D <br /> <br /> <br />STAFF ORIGINATOR: Diane Hankee PE, City Engineer <br /> <br />MEETING DATE: July 10, 2023 <br /> <br />TOPIC: Consider Resolution No. 23-67, Approving Change Order No. 1, <br />2023 Pheasant Run Reconstruction Project <br /> <br />VOTE REQUIRED: 3/5 <br /> <br /> <br />INTRODUCTION <br /> <br />Staff is requesting council approval of Change Order No. 1 for the 2023 Pheasant Run <br />Reconstruction Project. <br /> <br />BACKGROUND <br /> <br />On April 10, 2023, the City Council awarded the bid for the 2023 Pheasant Run Reconstruction <br />Project to A-1 Excavating, LLC in the amount of $886,886.00. Construction of the project is <br />scheduled to begin July 24th, 2023. The project includes watermain, sanitary sewer, storm <br />sewer replacement and street reconstruction. Several of the houses are closer to the street than <br />typical (25 to 30 feet) and are approximately 50 years old. The natural soils in the <br />neighborhood remain saturated throughout the year and are subject to expansion in the freeze <br />thaw cycle. <br /> <br />Due to the proximity of the houses to the street, the age of the houses, and the native soils, staff <br />is recommending a pre-condition survey to evaluate the condition of the homes in the project, <br />as well as the vibration monitoring throughout the duration of the project. <br /> <br />For Council consideration, staff has drafted Change Order No. 1 in the amount $29,800.00 to <br />perform a pre-condition survey and monitor the project vibration on the project. Funding for <br />the project is from the 2021 Street Reconstruction Bonds, the Water and Sewer Operating <br />Funds, the Trunk Water Fund, and the Street Reconstruction Fund. The 2023 Pheasant Run <br />Project contract with A-1 Excavating, LLC with Change Order No. 1 would be increased to <br />$919,686.00. This amount of Change Order No. 1 is within the project planned contingencies <br />and budget. <br /> <br />RECOMMENDATION <br /> <br />Staff is recommending approval of Resolution No. 23-67 for Change Order No. 1 in the amount <br />of $29,800.00 for the Pheasant Run Reconstruct Project. <br /> <br />ATTACHMENTS <br /> <br />1. Resolution 23-67 <br />2. Change Order No.1
The URL can be used to link to this page
Your browser does not support the video tag.