Laserfiche WebLink
Bluebill Ponds 2nd Addition <br />Development Agreement <br />July 10, 2023 <br /> page 3 <br />iv. The Developer’s engineer shall certify in writing, with an as-built survey, <br />that all grading complies with the approved grading plan prior to issuance <br />of any building permits. <br />v. The Developer shall promptly clear dirt and debris within public right s-of- <br />way and drainage and utility easements resulting from construction by <br />the Developer, its purchasers, builders and contractors within five (5) <br />days after notification by the City. The Developer shall be responsible for <br />all necessary street and storm sewer maintenance, including street <br />sweeping, until all home construction is completed, unless otherwise <br />released by the City. Warning signs shall be placed when hazards <br />develop in streets to prevent the public from traveling on them, including <br />detour signs if necessary. If and when the streets become impassable, <br />such streets shall be barricaded and closed. The Developer shall maintain <br />a smooth, hard driving surface and adequate drainage on all temporary <br />streets. <br />c. Final street grading, subbase, gravel base, concrete curb and gutter, and <br />bituminous base and wear course, street signs and striping shall be furnished <br />and installed. Not applicable. <br />d. Sidewalks, trails and street lighting shall be installed within 6 months of the <br />bituminous base course. Extensions may be approved by the City Engineer, due <br />to weather conditions, upon receipt of a written request in writing by the <br />Developer to the City. In no case shall such extension extend beyond one year <br />from the date of installation of bituminous base course. Not applicable. <br />e. Storm sewers, when determined to be necessary by the City Engineer, including <br />all necessary laterals, catch basins, inlets and other appurtenances, shall be <br />furnished and installed. <br />f. Sanitary sewer mains, laterals or extensions, including all necessary building <br />services and other appurtenances, shall be furnished and installed. <br />g. Water mains, laterals or extensions, including all necessary building services, <br />hydrants, valves and other appurtenances, shall be furnished and installed. <br />h. The Developer shall place iron monuments at all lot, block, and outlot corners <br />and at all other angle points on boundary lines consistent with the final plat. <br />Iron monuments shall be placed after all street and lawn grading has been <br />completed in order to preserve the lot markers for future pro perty owners. Lot <br />corner irons on the back property line shall be installed so that the top of the <br />iron corresponds to the finished ground elevation in accordance with the