My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-07-2023 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
08-07-2023 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 3:25:12 PM
Creation date
8/9/2023 3:31:09 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/07/2023
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />WORK SESSION STAFF REPORT <br />Work Session Item No. 3 <br /> <br />Date: August 7, 2023 <br /> <br />To: City Council <br /> <br />From: Michael Grochala, Community Development Director <br /> <br />Re: Otter Lake Road Extension Plans and Specifications <br /> <br /> <br />Background <br /> <br />The Otter Lake Road Master Plan study was completed and presented to the City Council in <br />December of 2022. The study identified the preferred alignment for the extension of Otter Lake <br />Road from Main Street (CSAH 14) to its intersection with 24th Avenue. With the current need <br />for regional stormwater management improvements to support development along the corridor <br />along with an arterial transportation corridor, staff is proposing to begin preparation of plans and <br />specifications. The project is currently identified in the City’s long range financial plan for <br />construction in 2025. Phase 1 stormwater improvements are also scheduled for construction in <br />2024. <br /> <br />The project would include the extension of trunk sanitary sewer and water main, storm sewer and <br />regional ponding, pedestrian/bicycle facilities along with the roadway. The project length is <br />approximately ¾ of a mile. The preliminary estimated cost is $8.4 million. <br /> <br />WSB and Associates have submitted a proposal to complete the plans and specification in the <br />amount of $468,258. Funding for the project is anticipated primarily from, municipal state aid, <br />trunk utility fund, and surface water management fund. Staff will be exploring grant <br />opportunities through the State of Minnesota as well. Funding will be partially offset by future <br />connection charges as development take place along the corridor. <br /> <br />Initiating the design will assist in refining the project costs, identifying funding sources, along <br />with solidifying the preferred alignment and identifying right-of-way needs. WSB will be <br />holding two open houses and along with individual property owner meetings as part of the <br />project development. <br /> <br />Requested Council Direction <br /> <br />Staff is requesting City Council direction to place the authorization for preparation of plans and <br />specification on the August 14, 2023 agenda. <br /> <br />Attachments <br /> <br />1. Otter Lake Road Preferred Alignment
The URL can be used to link to this page
Your browser does not support the video tag.