My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-14-2023 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
08-14-2023 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 10:08:43 AM
Creation date
8/15/2023 10:02:06 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/14/2023
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />AGENDA ITEM 6C <br />STAFF ORIGINATOR: Diane Hankee PE, City Engineer <br />MEETING DATE: August 14, 2023 <br />TOPIC: Lake Drive Trunk Watermain Improvements <br />i.Consider Resolution No. 23-79, Accepting bids, Awarding <br />Construction Contract <br />ii.Consider Resolution No. 23-82, Approving Construction <br />Services Contract with WSB & Associates <br />VOTE REQUIRED: 3/5 <br />INTRODUCTION <br />Staff is requesting Council’s consideration to accept bids, award a construction contract, and <br />approve a construction services contract for the Lake Drive Trunk Water Main Improvements <br />Project. <br />BACKGROUND <br />On June 26, 2023, the City Council ordered the project and authorized the advertisement for bid <br />for the Lake Drive Trunk Watermain Improvements Project. The project is located on the <br />easterly side of Lake Drive, between Forsham Lake Drive and Park Court. The project consists of <br />directional drilling in new watermain to loop the two existing stubs on both ends of the project. <br />This project is a trunk improvement to provide strengthening of the City’s system which provides <br />redundancy, improved pressure and circulation. <br />Bids were received on Tuesday, August 8, 2023. A total of 5 bids were received and are <br />summarized in the following table: <br />The low bid was submitted by Geislinger & Sons in the amount of $315,650.01 which is within <br />the planned budget and is being recommended for award. Geislinger & Sons successfully <br />completed the City’s 2018 West Shadow Lake Drive Street Reconstruction Project. <br />Contractor Total Base Bid <br />Geislinger & Sons $315,650.01 <br />Bituminous Roadways, Inc. $318,147.50 <br />Northdale Construction $347,467.92 <br />Meyer Contracting, inc. $385,923.16 <br />GM Contracting, Inc. $659,172.70
The URL can be used to link to this page
Your browser does not support the video tag.